Loading...
326 S LEMON ST (3)Permit TypesC BLD ELE MEPLM X Permit Number: BLD2023-03534 Issued: 01/10/2024 www.anaheim.net/building (714)7654626 Quarter Section: 84 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 326 S LEMON ST, ANAHEIM, CA 92805 Legal Description: A TR ORIGINAL CITY LOTS-ANAHEIM BLK LOT 56 ORIGINA APN: 03702119 _ Project Description: Trash Enclosure: 53 In It new trash enclosure. REF: BLD2023-03533 Living Area: Number of Stones: 1 Valuation: 20,000,00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Smnklered: No Cool Roof: Total Fees paid for permit: 666.42 People Associated with Project: Contractor SERVCO INC 18011 SKY PARK CIRCLE STE E201706261519094030 IRVINE, CA 92614 Permit Applicant Jasmin Cardenas Owner PUT THE LIME IN THE COCONUT LLC 696 RANDOLPH AVE A AmhitectlEngineer JEFFREY S COFFMAN 2000 E CHAPMAN AVE STE 202 FULLERTON, CA 92831 Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PNP"Elm Cq` Cityof Anaheim o4 iO Building Division f 2 �OVA'DED ya�1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer I I Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormslfrenches (Footings) 23 COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed y Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing !Only after Flag Ele. Mac 8 Fuel Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Efe., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service