326 S LEMON ST (3)Permit TypesC BLD ELE MEPLM
X
Permit Number: BLD2023-03534
Issued: 01/10/2024
www.anaheim.net/building
(714)7654626
Quarter Section: 84
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 326 S LEMON ST, ANAHEIM, CA 92805
Legal Description: A TR ORIGINAL CITY LOTS-ANAHEIM BLK LOT 56 ORIGINA
APN: 03702119 _
Project Description: Trash Enclosure: 53 In It new trash enclosure. REF: BLD2023-03533
Living Area:
Number of Stones:
1 Valuation:
20,000,00
Garage Area:
Construction Types:
VB
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Smnklered:
No
Cool Roof:
Total Fees paid for permit:
666.42
People Associated with
Project:
Contractor
SERVCO INC
18011 SKY PARK CIRCLE STE E201706261519094030 IRVINE, CA 92614
Permit Applicant
Jasmin Cardenas
Owner
PUT THE LIME IN THE COCONUT LLC
696 RANDOLPH AVE A
AmhitectlEngineer
JEFFREY S COFFMAN
2000 E CHAPMAN AVE STE 202 FULLERTON, CA 92831
Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNP"Elm Cq`
Cityof Anaheim o4 iO
Building Division f 2
�OVA'DED ya�1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
I I
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklFormslfrenches (Footings)
23
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
y
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing !Only after Flag Ele. Mac 8 Fuel
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Efe., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service