131 S CONNIE CIR (2)Permit Types BLD ELE MEC :M::j X X Permit Number: BLD2024-02901 Issued: 06/27/2024 www.anahel m. net/bu ilding (714)765-4626 Quarter Section: 134 Site Address: 131 S CONNIE CIR, ANAHEIM, CA 92806 Legal Description: N TR 6784 BLK LOT 5 APN: 26802205 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Photovoltaic System with Micro -inverters: Install roof mounted solar with (22) modules, (22) micro -inverters and (1) 200amp Main Service Living Area: Number of Stories: 1 Valuation: 20,320.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 1,408.64 People Associated with Project: Contractor LGCY INSTALLATION SERVICES LLC DBA LG 3333 N. DIGITAL DRIVE STE 600 LEHI, UT Permit Applicant Mary Hernandez Owner TAPIA, CARLOS E 131 S CONNIE CIR Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Meter/Disc Sw - Under 600 V, up to 200 1 amps Microinverter 22 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PNeIM �q< Cityof Anaheim gk iO Building Division F'- i O > D�NDeo tsy^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final I111NI't Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been stoned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable Items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical 5 Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do nnt backfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service