Loading...
324 E ALBERTA STPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-05971 Issued: 11/12/2024 vnvw.a na hei m. net/building (714)765-4626 Quarter Section: 82 Site Address: 324 E ALBERTA ST, Anaheim, CA 92805 Legal Description: A TR ROTHAERMELS ADD BLK 6 LOT 1 APN: 03516206 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 76S - 5153 Project Description: Reroof: To remove and install (21) squares of composition shingles of composition shingles over house. Living Area: Number of Stories: 1 valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Root: Tout Fees paid for Permit: People Associated with Project: Contractor J ECHAVES INC DBA JH ROOFING 2415 SANTIAGO ST201909060858586290 SANTA ANA, CA 92706 Permit Applicant Joseph AEchaves Owner YOUNG, JEFFREY R 1342 S SPAULDING AVE 11,000.00 VB 360.43 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures oty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. �NhµEIM �'` Cityof Anaheim Op iO Building Division i > - !(,Np Ep Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7664041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lie. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor hear Roof ( heathi /Diaphragm/Frame) 11 2A Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service