Loading...
934 S SARAH WAYPermit Types SLID ELE MEC PLM CITY OF ANAHEIM X (}. BUILDING DIVISION Permit Number: BLD2024A4160 200 S. ANAHEIM BLVD. Issued: 08/09/2024 (714)765. 5153 www,anaheim.net/building (714)765-4626 Quarter Section: 105 Site Address: 934 S SARAH WAY, ANAHEIM, CA 92805 Legal Description: N TR 8758 BLK LOT 74 '- '- "'- � '•"---� '•- - - APN: 23401310 Project Description: Reroof: Remove and install (23) sq of composition shingles over entire unit 934 Living Area: Number of Stories: 1 Valuation: 16,041.00 Garage Area: Construction Types: N/A CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Sprinkleree: Cool Roof: Total Fees pale for Permit: 351.09 People Associated with Project: Contractor BARNETT ROOFING 16581 DELTON CIR UNIT 3200505201610474910 HUNTINGTON BEACH, CA 92647 Permit Applicant Preston Cox Owner HARNEY. BRUCE G TR HARNEY 4342 SAN PABLO CIR Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim PHEIPA '<.o Building Division _/ Z u > FOUNDED tag^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 766.4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7664041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 766-4691 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 7654194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765.6153) Last Inspection -Final Only After Above Completed rt ' y� Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor ear Ro sheathin Diaphragm/Frame) Masonry(Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Men.) Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service