Loading...
287 N PASEO MADEROPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-03874 Issued: 07/29/2024 w,ww.anaheim.net/building (714)7654626 Quarter Section: 190 Site Address: 287 N PASEO MADEROAnaheim, CA 92807 CITY OF ANAHEIM BUILDING DIVISION 6c� 200 S. ANAHEIM BLVD. (714) 765 - 5163 Legal Description: N TR 8080 BLK LOT 51 APN:35814322 - Project Description: Reroof: Remove and install (30) sq of composition shingles over the entire house and attached garage Living Area: Number of Stories: 1 Valuation: 1,300.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit 350.17 People Associated with Project: Permit Applicant Mauncio Muniz Owner MUNIZ. MAURICIO & BELEN 287 N PASEO MADERO Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qly The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PNpNEIM ��` Cityof Anaheim o� iO Building Division F Z U > _ DUNDED tgh Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install sub0oor or pour floor slab until the follwing applicable items have been Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been saned. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Roo ,,thing/ iaphragm/Frame) AIL— Mascmiy- einf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Met; & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor i Do not backfill unless s,oned off) Sewer Water Engineering Backflow, (Testable Only) Water Service