Loading...
153 S LA PAZ ST (4)Permit Types BLD 1 ELE MEC FILM X Permit Number: BLD2024-03902 Issued: 08/21/2024 www.anaheim. net/bu ilding (714)765-4626 Quarter Section: 191 Site Address: 153 S LA PAZ ST, Anaheim, CA 92807 Legal Description: N TR 6734 BLK LOT 6 APN: 36305312 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Electrical: 200 amp panel upgrade. REF BLD2024-03181 Living Area: Number of Stories: 0 Valuation 0.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 177.00 People Associated with Project: Owner SHUBIN, KENNETH N $ COLLEEN E 153 S LA PAZ ST Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Meter/Disc Sw - Under 600 V, up to 200 1 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. City of Anaheim P�f,NEIM o1( 10 io Building Division f i > OVNDEO fah^� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground ElectrocielUfer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-5163) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Undernoor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) - Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have stoned.been 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New ! Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless q oned off) Sewer Water Engineering Backflow (Testable Only) Water Service