153 S LA PAZ ST (4)Permit Types
BLD 1 ELE MEC FILM
X
Permit Number: BLD2024-03902
Issued: 08/21/2024
www.anaheim. net/bu ilding
(714)765-4626
Quarter Section: 191
Site Address: 153 S LA PAZ ST, Anaheim, CA 92807
Legal Description: N TR 6734 BLK LOT 6
APN: 36305312
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Electrical: 200 amp panel upgrade. REF BLD2024-03181
Living Area: Number of Stories: 0 Valuation 0.00
Garage Area: Construction Types: N/A
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit: 177.00
People Associated with Project:
Owner SHUBIN, KENNETH N $ COLLEEN E 153 S LA PAZ ST
Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Meter/Disc Sw - Under 600 V, up to 200 1
amps
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
City of Anaheim P�f,NEIM o1(
10 io
Building Division f i
>
OVNDEO fah^�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 7655126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-6041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrocielUfer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Formsrrrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5163)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Undernoor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
-
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
stoned.been
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
!
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless q oned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service