801 S COTTONTAIL LN (2)r Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-06283
Issued: 12/02/2024
www. anaheim. neUbu i Iding
(714)765-0626
Quarter Section: 214
CITY OF ANAHEIM
Site Address: 801 S COTTONTAIL LN, ANAHEIM, CA 92808
Legal Description: N TR 12688 BLK LOT 47
APN: 35450116
Project Description: Residential EV Charger Level 2
Living Area:
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Roof:
Number of Stones:
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 766 - 5153
Valuation:
Construction Types:
Occupancy Groups:
Fire Spnnkiered:
Total Fees paid for Permit:
People Associated with Project:
Contractor ELECTRICAL OPTIONS INC 8219 E. BLACK WILLOW CIR #200 ANAHEIM, CA
Permit Applicant MANUELITO CRUZ 8219 E Blackwillow Cir Apt 200 Anaheim, CA 92808
0,00
177.00
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty
EV Charger 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
PNPNEIM cqC
Cityof Anaheim o
Building Division �0
1u la
1
�OUNOED t8�n
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Cornpleted
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service