Loading...
801 S COTTONTAIL LN (2)r Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-06283 Issued: 12/02/2024 www. anaheim. neUbu i Iding (714)765-0626 Quarter Section: 214 CITY OF ANAHEIM Site Address: 801 S COTTONTAIL LN, ANAHEIM, CA 92808 Legal Description: N TR 12688 BLK LOT 47 APN: 35450116 Project Description: Residential EV Charger Level 2 Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: Number of Stones: BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 766 - 5153 Valuation: Construction Types: Occupancy Groups: Fire Spnnkiered: Total Fees paid for Permit: People Associated with Project: Contractor ELECTRICAL OPTIONS INC 8219 E. BLACK WILLOW CIR #200 ANAHEIM, CA Permit Applicant MANUELITO CRUZ 8219 E Blackwillow Cir Apt 200 Anaheim, CA 92808 0,00 177.00 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. PNPNEIM cqC Cityof Anaheim o Building Division �0 1u la 1 �OUNOED t8�n Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Cornpleted Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service