910 S CANYON HEIGHTS DR (5)Permit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2020-02652
Issued: 02/07/2022
www.anaheim.net/building
(714)766-4626
Quarter Section: 232
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 6153
Site Address: 910 S CANYON HEIGHTS DR, ANAHEIM, CA 92808
Legal Description:
APN: 51408130
Project Description: New Residential Construction: 3,846 sq ft new two-story home with 4 bedrooms and 5 bathrooms. 38 sq ft front
porch. 290 sq ft patio cover. 192 sq ft second story deck. 548 sq ft attached garage and storage. Install residential roof mounted solar with
(33) modules and (33) micro -inverters.
Living Area:
3846
Number of Stories:
2 Valuation:
25p000.00
Garage Area:
548
Consnuction Types:
Vat
Carport Area:
Occupancy Groups:
U. R3
Balcony / Deck Area:
192
Fire Spdnktered:
No
Cool Roof:
Total Fees paid for Permit:
26,498.08
People Associated with Project:
Contractor MONBRI CONSTRUCTION SERVICES INC 2603 OLIVE LANE SANTA ANA, CA 92706
Permit Applicant Javier MBdio
Owner BRUCE FRANCIS LUX TR
910 S CANYON HEIGHTS
DR ANAHEIM HILLS, CA 92808
Type Electrical Fixtures
Qty
Type Plumbing Fixtures
Qty Mechanical Fixtures
Qty
Meter/Disc Sw - Under 600 V, up to 200
1
Bath Tub
2 Factory Built Fireplace Chimney
1
amps
Dishwasher
1 Heating Appliances, including vent
1
Micro Inverter
33
Heating/Cooling Coil
1
Motors - up to 1 h.p.
3
Garbage Disposal
1
Residential Registers
17
New or total rewire - 1 or 2 family
3846
Gas System (outlets)
1
Ventilation Fan - <- 300 cfm on single duct
6
New or total rewire - garage/carport
548
Kitchen Sink
1
Sub Panel/Temp Pwr - Under 600 V, up to
2
Laundry Tray
1
200 amps
Lavatory
6
Repair/Drainage AlterationlVent Piping
1
Sewer per 100 ft.
1
Shower
2
Washing Machine Rough
1
Water Closet
4
Water Distribution
1
Water Heater
1
Water Main per 100 ft.
1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNf,tl Elm �1C
Cityof Anaheim 04 iO
Building Division i
• FDVN DED yah^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Z
��
Plumbing Final
"' 6
Mechanical Final
1'v/6�Z'"\
\. {t,,-
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
h 11 n10Z
r
pp
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
v U jv$
�/
COA/Migation Measures
Do not install subiloor or pour floor slab until the follwing applicable items have been
sioned-
Building Final (714 765-5153)
Last Inspection -Final Only After Ahove Completed
\✓/�/
o�I\
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
!LLL
7Am
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
73
Do not cover or conceal the work below until the following applicable Items have
,, n
let Floor Shear
z3
-YM,
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
% 7e /L3
I
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
\v L3
�Zam
Rough COA/Mitagation Measures
Plumbing Inspections
G RA N* - OULMgk & per,
Framing IOnly afte, Plhq Ele 1,7ec b Fire)
�Z��
{,'
�.,d ("1,
Insulation (Sound/Energy)
N,oN
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
rA
c/-,
Exterior Lath
�-L I
Electrical Inspections
�� OfW
(� S%
Electrical Service Meter -I Meter will be set within 2-3
business days aftar apprnvah Excludes New
Construction
�i J'(
I
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Inn [lot I 'I'
Sewer
Water Engineering Backflow (Testable Only)
Water Service