Loading...
955 S HARBOR BLVD�- Permit Types BLD ELE MEC PLM X Permit Number: OLD2022-00769 Issued: 02/14/2023 www.anaheim.net/building (714)765.4626 Quarter Section: 61 Site Address: 955 N HARBOR BLVD, ANAHEIM, CA 92801 Legal Description: P BK 118 PG 9 PAR 1 APN: 03401112 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Tenant Improvement: Facade renovation, new parapet walls and 1180 sf. of stucco Living Area: Number of Stories: t Valuation: Garage Area'. Ccnstructlon Types: Carport Area. Occupancy Groups: Balcony I Deck Area', Fire Sprinklered: Cool Roof Total Fee. paid for Pernik: People Associated with Project Contractor STORM CONSTRUCTION INC 23742 BUNDY CANYON RD WILDOMAR, CA Permit Applicant Rafael Areola Owner DEL HARBOR P 0 BOX 10077 Architect/Engineer ANWAR ALAM 372 FLORAL VIEW IRVINE, CA 92618 85,000.00 VB No 1,805.80 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ', p EIM �7< Cityof Ana hei m D� iO Building DIVISIOn r'- Z �OV/yDED t Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subiloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfoor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections y orti�O 6oJ� PARAPL"f t.✓fl-t-S — 3 S Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.)/IO�� Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) 1, -( Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/DiaphragmlFrame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele_ Mec. & Fire) Insulation (Sound/Energy) Donal tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service