Loading...
805 S WESTVALE DR (9)Permit Types BLD 1 ELE MEC PLM X Permit Number: BLD2024-04625 Issued: 09/20/2024 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 •5153 vvvyw.anaheim.net/building (714)7654626 Quarter Section: 6 Site Address: 805 S WESTVALE DR, Anaheim, CA 92804 Legal Description: N TR 2839 BLK LOT 149 TR 2839 LOT 149 POR OF LOT APN: 07942525 Project Description: Seismic Upgrade: Voluntary seismic retrofit. Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: Number of Stones: 1 Valuation: Construction Types: Occupancy Groups: Fire Spnnklered: Total Fees Feld for Permit: People Associated with Project: Contractor THANH QUOC TRAIN 15 GENOA STREET UNIT B ARCADIA, CA Permit Applicant Thanh QTran 15 Genoa Street Unit B ARCADIA, CA 91006 Owner WILLIAMSON, DELMER J 805 S WESTVALE DR 3,000.00 VB 407.39 Type Electrical Fixtures Cry Type Plumbing Fixtures City Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. 5 y� P�PH EI&f �. City of Anaheim OF o Building DIVISIon f' i U > _ OVNDED �a Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been stared : Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Remf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbina Inspections Framing (Only after Plbg_ Ele Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Qonstruction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor t Do not backfill unJess sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service