805 S WESTVALE DR (9)Permit Types
BLD 1 ELE MEC PLM
X
Permit Number: BLD2024-04625
Issued: 09/20/2024
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 •5153
vvvyw.anaheim.net/building
(714)7654626
Quarter Section: 6
Site Address: 805 S WESTVALE DR, Anaheim, CA 92804
Legal Description: N TR 2839 BLK LOT 149 TR 2839 LOT 149 POR OF LOT
APN: 07942525
Project Description: Seismic Upgrade: Voluntary seismic retrofit.
Living Area:
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Roof:
Number of Stones:
1 Valuation:
Construction Types:
Occupancy Groups:
Fire Spnnklered:
Total Fees Feld for Permit:
People Associated with Project:
Contractor THANH QUOC TRAIN 15 GENOA STREET UNIT B ARCADIA, CA
Permit Applicant Thanh QTran 15 Genoa Street Unit B ARCADIA, CA 91006
Owner WILLIAMSON, DELMER J 805 S WESTVALE DR
3,000.00
VB
407.39
Type Electrical Fixtures Cry Type Plumbing Fixtures City Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
5 y� P�PH EI&f �.
City of Anaheim OF o
Building DIVISIon f' i
U >
_
OVNDED �a
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
stared :
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Remf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbina Inspections
Framing (Only after Plbg_ Ele Mec & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Qonstruction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
t Do not backfill unJess sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service