950 S CANYON HEIGHTS DR (16)Permit Types
CITY OF ANAHEIM
BLD ELE ME C
PLM
X
BUILDING DIVISION
Permit Number: BLD2022-00121
200 S. ANAHEIM BLVD.
Issued: 12/14/2022
www.anaheim.net/building
`' TII
(7141765 - 5153
(714)765-4626
`' � V
/ `Q ( VV
Quarter Section: 232
Site Address: 950 S CANYON HEIGHTS DR, ANAHEIM, CA 92808
Legal Description: N TR 15123 BLK LOT 17
APN: 51408105
Protect Description: Patio Cover: Construct 441 sq.ft balcony and patio
cover 441 sq.ft. Remove (3) existing windows and replace with
sliding door.
Living Area: Number of Stories:
2 Valuation: 2,600.00
Garage Area:
Construction Types: VB
Carport Area.
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof.
Total Fees paid for Parma: 1.949.11
People Associated with Project:
Permit Applicant Janet Shaevitz
Owner SHAEVITZ KEVIN 5 JANET
950 S CANYON HEIGHTS DR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty,
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
�- EIM Off`
City of Anaheim OA io
Building Division F i
�OVNOED tay^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765
Engineering Final (714) 765-5126NIOTCO" %
PLET
Ep
INSPECTION I
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-504*, , -r-- �
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765.6153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service