131 S BELLEZA LN (3)Permit Types
CITY OF ANAHEIM
BLD ELE MEC PLM
X
BUILDING DIVISION
Permit Number: BLD2024-02236 200 S. ANAHEIM BLVD.
Issued: 05/02/2024 f7141 765.5153
vivirmi.anaheim.net/building
(714)7654626
Quarter Section: 162
Site Address: 131 S BELLEZA LN, ANAHEIM, CA 92807
Legal Description: N TR 9336 BLK LOT 4
APN: 36124125
Project Description: Residential Remodel: Changeout (32) windows and (3) patio doors
Living Area: Number of Stories: 1
Valuation:
Garage Area:
Construction Types:
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof: Total
Fees paid for Permit:
People Associated with Project:
Contractor RENEWAL BY ANDERSEN LLC 22982 ALCALDE DR201407031118596237 LAGUNA HILLS, CA 92653
Permit Applicant Marco Pineda
Owner ACOSTA, GREGORY R & SUSAN K 131 S BELLEZA LN
30,200.00
NIA
765.93
Type Electrical Fixtures Cty Type Plumbing Fixtures City Mechanical Fixtures Cry
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�PHEIM �q<
Cityof Anaheim D� iO
Building Division i
>
CGNDED 51,
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7664280
Engineering Final (714) 765-5126
INSPECTION
I DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-6041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beensio
n
Building Final (714 7655153)
Last Inspection -Final only After Above Completed
t2%
r3�
y
y,
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been slimed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backf 11 unless sioned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service