522 W HAMPSHIRE AVEPermit Types
BLa.
I ELE
I MEC
I PLM
X
Permit Number: BLD2024-06292
Issued: 12/02/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 74
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Site Address: 522 W HAMPSHIRE AVE H-LITE, ANAHEIM, CA 92805
Legal Description: N TR 1142 BLK LOT 7
APN: 25112202
Project Description: Reroof: Remove and reinstall (25) squares of composition shingles over bldg units A-D
,4% • ��
"I'I
ni1�l.
Living Area:
Number of stories:
0 Valuation: 12,000.00
Garage Area:
Construction Types: N/A
carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit: 362.36
People Associated with
Project:
Contractor
M Ii M ROOFING
25434 MORNING STAR200006071613095550 LAKE FOREST, CA 92630
Permit Applicant
Mitchell McClellan
Owner
THOMAS, TIMOTHY P
23572 LAGARTO
Type Electrical Fixtures Oty Type Plumbing Fixtures Cry Mechanical Fixtures
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence of continue work.
PHEIM �.
City of Anaheim
Building Division z
I� �>
��•
�00 — �5^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground ElectrodelUfer
Water Engineering (714) 765.1591
Sub ListfBus. Lic. (714) 76531194 (Allow 10 business days)
Setback/FormsfTrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the folfwing applicable items have been
Building Final (714 765-5153)sioned
Last Inspection -Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionlMembrane Reinf.)
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
�4E
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been soned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(SheathinglDiaphragmlFrame)
Masonry (Reinf.lBond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service