327 N SUNKIST ST (4)fa —
Permit Types
BLD
ELE
MEC
PLM
X
X
X
Permit Number: BLD2024-05504
Issued: 10/15/2024
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
wwyr.anaheim.net/building
(714)7654626
Quarter Section: 112
Site Address: 327 N SUNKIST ST, ANAHEIM, CA 92806
Legal Description: S TWP 4 RGE 10 SEC 12 SEC 12 T 4 R 10 POR St/2 NE1
APN: 08338225
Project Description: Residential Remodel: Replace (1) showers with tile and electrical fixture upgrade
Living Area: Number of Stories: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spdnklered.
Cool Roof: Total Fees paid for Permit:
People Associated with Project:
Contractor LANI CONSTRUCTION INC 18075 VENTURA BLVD,SUITE 117 ENCINO, CA
Permit Applicant Shmuel Gad
Owner RUBIO, LAURA L 561 S COLT ST
10,000,00
N/A
452.30
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qly
Receptacle, switches, lights i Shower 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�pHE1M C7<
City of Anaheim OF io
Building Division F i
u a
�ovNDED is4^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
1ri
Plumbing Final
(
Mechanical Final
Cross Connection Control (714) 766.4280
Engineering Final (714) 7655126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7655041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7664591
Electrical Ground ElectrodelUfer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned
Building Final (714 7655153)
Last Inspection -Final Only After Above Completed
f2�KIL
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
11IG)2i EA �o� -,4�,.
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionlMembraneReinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
We
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Eli Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
li 11
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill nle,, sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service