Loading...
330 S YORKSHIRE CIR (2)W" Permit Types BLD ELE MEC FILM X Permit Number: BLD2024-04836 Issued: 09/12/2024 www.anaheim.neUbu ilding (714)765-4626 Quarter Section: 202 CITY OF ANAHEIM Site Address: 330 S YORKSHIRE CIR, ANAHEIM, CA 92808 Legal Description: N TR 9333 BLK LOT 19 APN: 35611109 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodel: Install (2) skylights. (200) sq ft the relay Living Area: Garage Area: Carport Area: Balcony f Deck Area: Cool Roof: Number of Stories: 1 Valuation: Construction Types: Occupancy Groups: Fire Spnnklered'. Total Fees paid for Permit: People Associated with Project: Contractor CLFAR VIEW ROOFING & CONSTRUCTIO 5938 LAUREL CANYON BLVD VALLEY VILLAGE, CA Owner STAMPER, LEONARD TR L 330 S YORKSHIRE CIR 4,000.00 NIA No 1,040.52 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PN^}1EIM C- City of Anaheim O� !^O Building Division i u a OONDED j8� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer Sub Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (7147655153) Last Inspection -Final Only After Above Completed Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildina Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.)� Floor (Joist/Girders) ' Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) _Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanics[) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service