531 N HAMPTON ST (5)City of Anaheim BUILDING DIVISION INSPECTION RECORD 0 SWIMMING POOL ADDRESS: 531 N HAMPTON ST, Anaheim, CA 92801 OWNER: TIRADO, CHRISTOPHER & ELIA PERMIT 4: SW1202400089 DATE ISSUED: 11/06/2024 DESCRIPTION: Demolition: 500 sq. ft. pool demolition with shell to be removed. POST THIS CARD WITH THE APPROVED PLANS IN A CONSPICUOUS PLACE ON THE JOB SITE Inspection Code I Date Inspector 1. Main Drain 504 2. Electric Bonding 506 3. Steel 508 4. Approval to Gunite 510 DO NOT GUNITE POOLISPA until all the above Inspections have been signed. 5. BLD-Steel and Electric bonding (Rock Structures, Slides Etc) 508 DO NOT GUNITE ROCK STRUCTURE (water feature, mck slide, fountain, waterfall, grotto etc.) until the above Inspection has been signed. 6. Underground Electric 512 7. Gas Piping Test 514 8. P-Trap Receptor 516 9. Backflow 518 10. Deck, Deck Drains, Equipotential & Accessory Bonding 520 DO NOT POUR FLATWORK unLl all the above inspections have been signed. 11. Rough Electrical 522 12. Fercing/Door Alarms 524 13. Piaster approval 526 DO NOT PLASTER until all the above Inspections have been signed. 14. Final Electric 1 528 Sub -Contractors List MUST be approved and pool cover on site PRIOR to Pool Final Inspection request FINAL INSPECTION CODE DATE INSPECTOR 15. Rough Demo 527 16. Final 599 p MISC. INSPECTIONS Da a Inspector Impsotil 1-5: 1. All plumbing to be completed and the system pressurized to 36Its. with water or house pressure. 2. All metal within 5 feet of pool water, and all pool equipment, must be bounded to pod reinforcing steel with 0 wild copper wire. Niche light shell, deck inserts, etc. shell be bonded m pod rebar, 3. Pool equipment is not required to be set at this time Inspections 6.10: 1. underground electric inspected prior to backfilling. 2. Gas line test at I M for 15 minutes with 16M gauge. 3. When polyethylene gas piping is used a oedlficate from a cedifed installer and tracer wire shall be provided per CPC 1210.1 7.2 APPENDIX I. Inspections 11-13: 1. Rough electric inspection wren all wiring is completed and ready prior to the plastering of poopspa. Potting compound in place at pumfic light niche. 2. Current Codo requires that any pod, spa or water feature contenting water 18 inches or more in depth shall be enclosed by a barrier adequate to prevent entry of small children. The banner shall comply with section 3109 of current CBC and CRC APPDENDIX V spec1png the height of any fence provided as banner to the pool &- shall be 60' above grade on the outside of the fence. 3. Doors from a camp. shall ..at the requirements for a gate. Glass windows within 5' of pool water shall be laminated glass. 4. Prior to pre -plaster Inspection, streets, curbs and city sidewalks will be inspected for any damage due to construction of pool or spas. 5. Grading complete with positive drainage to street or public way. All exposed plastic pipe shall be painted to protect from sunlight. Inspector. 14-16: 1. Gas and Electrical completely removed and 2x2 Was at bottom of pool and/or isolated elements. 2. Pool baciAlle4: A ) with future build - self-compecinng sand 95%with receipt. 9.) No future build - any fill. 3. After pool Is operating and in working condition with approved pool cover on site. INSPECTION REQUESTS Inspection requests made prior to 5:00 pm Monday - Friday will be scheduled on the following workday. To schedule your building inspection online, please go to hftps:llaca ammaim. neVCilizenAccess Inspection can normally be reached between 7:30 - 8:00 A.M. (714)765-5153 + 0 To access your inspection timeframe: Please go to www.aoaheim, net/building after 7:30am on the day of your Inspedbn. Under Online Services, dick on the link' Inspection Tmmennes' or call (714) 765-5153. 0 Ibldjobcards