531 N HAMPTON ST (5)City of Anaheim
BUILDING DIVISION
INSPECTION RECORD
0 SWIMMING POOL
ADDRESS:
531 N HAMPTON ST, Anaheim, CA 92801
OWNER:
TIRADO, CHRISTOPHER & ELIA
PERMIT 4:
SW1202400089
DATE ISSUED:
11/06/2024
DESCRIPTION:
Demolition: 500 sq. ft. pool demolition with shell to be
removed.
POST THIS CARD WITH THE APPROVED PLANS
IN A CONSPICUOUS PLACE ON THE JOB SITE
Inspection
Code
I Date
Inspector
1. Main Drain
504
2. Electric Bonding
506
3. Steel
508
4. Approval to Gunite
510
DO NOT GUNITE POOLISPA
until all the above Inspections have been signed.
5. BLD-Steel and Electric bonding
(Rock Structures, Slides Etc)
508
DO NOT GUNITE ROCK STRUCTURE
(water feature, mck slide, fountain, waterfall, grotto etc.) until the above Inspection has
been signed.
6. Underground Electric
512
7. Gas Piping Test
514
8. P-Trap Receptor
516
9. Backflow
518
10. Deck, Deck Drains,
Equipotential & Accessory
Bonding
520
DO NOT POUR FLATWORK
unLl all the above inspections have been signed.
11. Rough Electrical
522
12. Fercing/Door Alarms
524
13. Piaster approval
526
DO NOT PLASTER
until all the above Inspections have been signed.
14. Final Electric 1 528
Sub -Contractors List MUST be approved and pool cover on site
PRIOR to Pool Final Inspection request
FINAL INSPECTION
CODE
DATE
INSPECTOR
15. Rough Demo
527
16. Final
599
p
MISC. INSPECTIONS
Da a
Inspector
Impsotil 1-5:
1. All plumbing to be completed and the system pressurized to 36Its. with water
or house pressure.
2. All metal within 5 feet of pool water, and all pool equipment, must be bounded
to pod reinforcing steel with 0 wild copper wire. Niche light shell, deck inserts,
etc. shell be bonded m pod rebar,
3. Pool equipment is not required to be set at this time
Inspections 6.10:
1. underground electric inspected prior to backfilling.
2. Gas line test at I M for 15 minutes with 16M gauge.
3. When polyethylene gas piping is used a oedlficate from a cedifed installer
and tracer wire shall be provided per CPC 1210.1 7.2 APPENDIX I.
Inspections 11-13:
1. Rough electric inspection wren all wiring is completed and ready prior to the
plastering of poopspa. Potting compound in place at pumfic light niche.
2. Current Codo requires that any pod, spa or water feature
contenting water 18 inches or more in depth shall be enclosed by a barrier
adequate to prevent entry of small children. The banner shall comply with
section 3109 of current CBC and CRC APPDENDIX V spec1png the height of
any fence provided as banner to the pool &- shall be 60' above grade on the
outside of the fence.
3. Doors from a camp. shall ..at the requirements for a gate. Glass
windows within 5' of pool water shall be laminated glass.
4. Prior to pre -plaster Inspection, streets, curbs and city sidewalks will be
inspected for any damage due to construction of pool or spas.
5. Grading complete with positive drainage to street or public way. All
exposed plastic pipe shall be painted to protect from sunlight.
Inspector. 14-16:
1. Gas and Electrical completely removed and 2x2 Was at bottom of pool
and/or isolated elements.
2. Pool baciAlle4:
A ) with future build - self-compecinng sand 95%with receipt.
9.) No future build - any fill.
3. After pool Is operating and in working condition with approved pool cover on
site.
INSPECTION REQUESTS
Inspection requests made prior to 5:00 pm Monday - Friday
will be scheduled on the following workday.
To schedule your building inspection online, please go to
hftps:llaca ammaim. neVCilizenAccess
Inspection can normally be reached between
7:30 - 8:00 A.M.
(714)765-5153 + 0
To access your inspection timeframe:
Please go to www.aoaheim, net/building after 7:30am on the day of your
Inspedbn. Under Online Services, dick on the link' Inspection
Tmmennes' or call (714) 765-5153. 0