Loading...
222 N BEL AIR STPermit Types BLD ELE MEC PLM X Permit Number: OLD2024-05762 Issued: 10/29/2024 www.anaheim.net/building (714)765.4626 Quarter Section: 12 Site Address: 222 N BEL AIR ST, ANAHEIM, CA 92801 Legal Description: N TR 2780 BLK LOT 38 APN: 07049201 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765.5153 Project Description: Reroof: Remove ad install (30) sq of composition shingles over the entire house and attached garage Living Area: Number or Stones: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Poor: Total Fees paid for Permit: People Associated with Project: Permit Applicant Lance Ozboum Owner OZBOURN, LANCE C 222 N BEL AIR ST P i i ?NDEDj' 21,000.00 N/A 362.73 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. q.; PNr,HEIM �dC 1. i ty of Anaheim OF io Building Division a �' • FOVNOEo va"^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 INSPECTION DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7665041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Fonns/Trenchas (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been stoned Building Final (714 765-5153) Last Inspection -Final Only Aker Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been n d' 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) oo Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Flog., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mac.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service