210 N ROSE ST (3)Permit Types
BLD ELE IVIED I PLM
X
1A
Permit Number: BLD2020-02622
Issued: 07/07/2020
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 93
Site Address: 210 N ROSE ST
Legal Description: N TR 1157 LOT 12
CITY OF ANAHEIM
-d i_C!'�G -,IVISI
200 S. ANAHEIM� �L
(714) 765 - 5153
Project Description: Reroof: Tear off existing material and install 2,000 square feet of composition shingles onto house and
attached garage.
Valuation: $6,700.00
Construcion Types: WA, ,
Total Fees paid for Permit: 339.87
People Associated with Project:
Owner JAVIER MALDONADO HUERTA 210 N ROSE ST ANAHEIM CA 92805-3359
Contractor ROYALTY ROOFING INC 21601 VANOWEN STREET SUITE 202 CANOGA PARK CA 91303 00
Permit Applicant RAHEL SHITRIT
Type Electrical Fixtures City Type Plumbing Fixtures City Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
r�f,HEIM �q<
City of Anaheim D4 i0
Building Division Z
�OVNDEE) t
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPEC
Ali applicable items below must be signed before utilities am released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-6041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beensoned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
ti
"0
\
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reir f.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been soned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
\Q
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
j(,IL
o
f`
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service