Loading...
210 N ROSE ST (3)Permit Types BLD ELE IVIED I PLM X 1A Permit Number: BLD2020-02622 Issued: 07/07/2020 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 93 Site Address: 210 N ROSE ST Legal Description: N TR 1157 LOT 12 CITY OF ANAHEIM -d i_C!'�G -,IVISI 200 S. ANAHEIM� �L (714) 765 - 5153 Project Description: Reroof: Tear off existing material and install 2,000 square feet of composition shingles onto house and attached garage. Valuation: $6,700.00 Construcion Types: WA, , Total Fees paid for Permit: 339.87 People Associated with Project: Owner JAVIER MALDONADO HUERTA 210 N ROSE ST ANAHEIM CA 92805-3359 Contractor ROYALTY ROOFING INC 21601 VANOWEN STREET SUITE 202 CANOGA PARK CA 91303 00 Permit Applicant RAHEL SHITRIT Type Electrical Fixtures City Type Plumbing Fixtures City Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. r�f,HEIM �q< City of Anaheim D4 i0 Building Division Z �OVNDEE) t Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPEC Ali applicable items below must be signed before utilities am released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensoned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed ti "0 \ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reir f.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been soned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections \Q 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) j(,IL o f` Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service