Loading...
837 S LEMON ST (6)Permit Types BLD ELE I MEC PLM X X Permit Number: BLD2024-03523 Issued: 11/12/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 85 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 1714) 765 -5153 Site Address: 837 S LEMON ST, Anaheim, CA 92805 Legal Description: S TWP 4 RGE 10 SEC 15 SEC 15 T 4 R 10 LOT 50 X 154 APN: 03707306 Project Description: Photovoltaic System: Install second residential roof mounted solar system with (15) modules, (15) micro -inverters, 125amp subpanel and (2) ESS. (BLD2021-02129) Living Area: Number of Stories: 0 Valuation: 16,000.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area. Fire Spdnklered: Cool Roof. Total Fees paid for Parma: 1,606.45 People Associated with Project: Contractor SEMPER SOLARIS 1805 JOHN TOWERS AVENUE EL CAJON, CA 92020 Permit Applicant Franklin Guzman Owner SMITH, KEVIN GEORGE TR 837 S LEMON ST Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures Oh, ESS (Battery Storage) 2 Microinverter 15 Sub Panel/Temp Pwr - Under 600 V, up to 1 200 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PN PrxE1M CdC City of Anaheim pF�O Building Division _ z �> • �O�NoeD �aa^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 101�1Zy Ik(�- Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 766.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormslTrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the folWng applicable items have been i ne Building Final (714 765-5153) Last Inspection -Final Only After Above completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinL/BOnd BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mac. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (E=New Interior Lath Exterior LathElectrical Inspections Electrical Service Meter-(-3 business days after approv Exterior Plaster (Brown T-Bar (Struct., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service