837 S LEMON ST (6)Permit Types
BLD
ELE
I MEC
PLM
X
X
Permit Number: BLD2024-03523
Issued: 11/12/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 85
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
1714) 765 -5153
Site Address: 837 S LEMON ST, Anaheim, CA 92805
Legal Description: S TWP 4 RGE 10 SEC 15 SEC 15 T 4 R 10 LOT 50 X 154
APN: 03707306
Project Description: Photovoltaic System: Install second residential roof mounted solar system with (15) modules, (15) micro -inverters,
125amp subpanel and (2) ESS. (BLD2021-02129)
Living Area: Number of Stories: 0 Valuation: 16,000.00
Garage Area: Construction Types: N/A
Carport Area: Occupancy Groups:
Balcony / Deck Area. Fire Spdnklered:
Cool Roof. Total Fees paid for Parma: 1,606.45
People Associated with Project:
Contractor SEMPER SOLARIS 1805 JOHN TOWERS AVENUE EL CAJON, CA 92020
Permit Applicant Franklin Guzman
Owner SMITH, KEVIN GEORGE TR 837 S LEMON ST
Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures Oh,
ESS (Battery Storage) 2
Microinverter 15
Sub Panel/Temp Pwr - Under 600 V, up to 1
200 amps
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PN PrxE1M CdC
City of Anaheim pF�O
Building Division _ z
�>
• �O�NoeD �aa^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
101�1Zy
Ik(�-
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 766.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklFormslTrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the folWng applicable items have been
i ne
Building Final (714 765-5153)
Last Inspection -Final Only After Above completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisVGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (ReinL/BOnd BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mac. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (E=New
Interior Lath
Exterior LathElectrical
Inspections
Electrical Service Meter-(-3
business days after approv
Exterior Plaster (Brown
T-Bar (Struct., Ele., or Mee.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service