315 S KNOTT AVE (5)Pe
rmn Types
BLD ELE MEC PLM CITY OF ANAHEIM
X BUILDING DIVISION
Permit Number: BLD2024-06367 200 S. ANAHEIM BLVD.
Issued: 12/05/2024 1714) 765. 5153
www.anaheim.net/building
(714)76511626
Quarter Section: 1
Site Address: 315 S KNOTT AVE, Anaheim, CA 92804
Legal Description: S TWP 4 RGE 11 SEC 15 SEC 15 T 4 R 11 FOR NE1/4
APN: 13408246
:I bj r:1
-71
L i
4 ll,"
4s,
Project Description: Reroof: To remove and install (30) squares of composition shingles and (45) squares of flat roof torch down over
church building used as offices.
Living Area: Number of stories 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for parrot:
73,800.00
VB
People Associated with Project:
Contractor STAR COURSE ROOFING COMPANY 18627 BROOKHURST ST STE 524ABCDE11167485 FOUNTAIN VALLEY, CA 92708
Permit Applicant Mercedes Wslshe
Owner CHURCH, KNOTT AVENUE CHRISTIAN 315 S KNOTT AVE
495.66
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
HPyt EIM O�
City of Anaheim o� P <,O
Building Division 2
1 •
�0NNDED tsry^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 766.6126
Fire Sprinkler (ONLY) (714) 765.5041
INSPECTION I
DATE I
INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
SetbacWForms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
BuildingFinal 714 765-5163
( )
Last Inspection -Final Only After Above Completed
"11 0
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2.3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service