Loading...
315 S KNOTT AVE (5)Pe rmn Types BLD ELE MEC PLM CITY OF ANAHEIM X BUILDING DIVISION Permit Number: BLD2024-06367 200 S. ANAHEIM BLVD. Issued: 12/05/2024 1714) 765. 5153 www.anaheim.net/building (714)76511626 Quarter Section: 1 Site Address: 315 S KNOTT AVE, Anaheim, CA 92804 Legal Description: S TWP 4 RGE 11 SEC 15 SEC 15 T 4 R 11 FOR NE1/4 APN: 13408246 :I bj r:1 -71 L i 4 ll," 4s, Project Description: Reroof: To remove and install (30) squares of composition shingles and (45) squares of flat roof torch down over church building used as offices. Living Area: Number of stories 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for parrot: 73,800.00 VB People Associated with Project: Contractor STAR COURSE ROOFING COMPANY 18627 BROOKHURST ST STE 524ABCDE11167485 FOUNTAIN VALLEY, CA 92708 Permit Applicant Mercedes Wslshe Owner CHURCH, KNOTT AVENUE CHRISTIAN 315 S KNOTT AVE 495.66 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. HPyt EIM O� City of Anaheim o� P <,O Building Division 2 1 • �0NNDED tsry^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 766.6126 Fire Sprinkler (ONLY) (714) 765.5041 INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) SetbacWForms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed BuildingFinal 714 765-5163 ( ) Last Inspection -Final Only After Above Completed "11 0 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2.3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service