291 S RIVERWOOD CIR (7)Permit Types
BUD 1ELE MEC PLM
X
Permit Number: BLD2022-06140
Issued: 12/28/2022
www.anaheim.net/building
(714)7654626
Quarter Section: 197
CITY OF ANAHEIM
Site Address: 291 S RIVERWOOD CIR, ANAHEIM, CA 92807
Legal Description: N TR 9206 BLK LOT 5
APN: 35626116
BUILDING DMSION
200 S. ANAHEIM BLVD.
(7141 765 -5153
Project Description: Reroof: Remove existing to install (16) sq of composition shingles over portion of house
Living Area: Number of Stones: 2 Veluatlon:
Garage Area: C vistnx.5on Types:
Carport Area: Occupancy Groups:
Balcony) Deck Area: Fire Sprinklers&
Cool Roof: Tolal Fen paid for P.m:
People Associated with Project:
Permit Applicant Leslie Garcia P.O BOX 3189 ANAHEIM, CA 92803
Owner MC GAVIN DOUGLAS J TR MC 291 S RIVERWOOD CIR
5,000 00
N/A
339.65
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�PN EIM tq`
City of Anaheim of io
Building Division /_
�>I
�• -
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126 RE
_- y
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041 1
.,
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
'
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591 114 U
I" .i PI
r t" LL-'t—
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures DAT
t"L I ify
Do not install subfleor or pour floor slab until the follwing applicable items have been
siQned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinli
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Donor cover o: conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing innry after Fog Etc Mec & Fre,
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable Items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
r" r rk
Sewer
Water Engineering Backflow (Testable Only)
Water Service