Loading...
291 S RIVERWOOD CIR (7)Permit Types BUD 1ELE MEC PLM X Permit Number: BLD2022-06140 Issued: 12/28/2022 www.anaheim.net/building (714)7654626 Quarter Section: 197 CITY OF ANAHEIM Site Address: 291 S RIVERWOOD CIR, ANAHEIM, CA 92807 Legal Description: N TR 9206 BLK LOT 5 APN: 35626116 BUILDING DMSION 200 S. ANAHEIM BLVD. (7141 765 -5153 Project Description: Reroof: Remove existing to install (16) sq of composition shingles over portion of house Living Area: Number of Stones: 2 Veluatlon: Garage Area: C vistnx.5on Types: Carport Area: Occupancy Groups: Balcony) Deck Area: Fire Sprinklers& Cool Roof: Tolal Fen paid for P.m: People Associated with Project: Permit Applicant Leslie Garcia P.O BOX 3189 ANAHEIM, CA 92803 Owner MC GAVIN DOUGLAS J TR MC 291 S RIVERWOOD CIR 5,000 00 N/A 339.65 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PN EIM tq` City of Anaheim of io Building Division /_ �>I �• - Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 RE _- y INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 1 ., Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 ' Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 114 U I" .i PI r t" LL-'t— Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures DAT t"L I ify Do not install subfleor or pour floor slab until the follwing applicable items have been siQned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinli Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Donor cover o: conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing innry after Fog Etc Mec & Fre, Insulation (Sound/Energy) Do not tape or plaster until the following applicable Items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor r" r rk Sewer Water Engineering Backflow (Testable Only) Water Service