Loading...
265 S OWENS DR (2)Permit Types BLD ELE MEC I PLM x x x x Permit Number: BLD2021-00444 Issued:02/02/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 202 Site Address: 265 S OWENS DR Legal Description: P M 118-41 PAR 1 POR OF PAR HotM CITY OF ANAHEIM r-i_m_pirla L)J /pcin.i 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential remodel: kitchen, master bed/bath with electrical, mechanical, plumbing and drywall. REF: INV2021-00012 Valuation: $20,000.00 Construcion Types: WA. , Total Fees paid for Permit: 1.294.60 People Associated with Project: Owner JAE S LEE 265 S OWENS DR ANAHEIM CA 92808-1327 Permit Applicant DANIELKIM Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights 10 Bath Tub 1 Ventilation Fan - > 300 cfm on single duct 3 Shower 3 Lavatory 6 Water Closet 3 Kitchen Sink 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. Ibiu pcm.a combo P�?, _A4 ��( City of Anaheim o� io Building Division F i U > 'OONDED tery^ Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (71) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (�14) 765.4591 (— a11r -- Electrical Ground ElectrodelUfer Sub LisVBus. Lic. (714) 765-5194 (Allow 1 ) i SetbacklFormsrrrenches(Footings) COAIMigation Measures NOT C MPL TEED Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Abov mrim Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg Etc Men & fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor 100 not hjrkfiII,mIc,s signori pip Sewer Water Engineering Backflow (Testable Only) Water Service