Loading...
956 S RIDGECREST CIRPermit Types LD 1 ELE MEC PLM X Permit Number: BLD2024-06533 Issued: 12/16/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 216 CITY OF ANAHEIM Site Address: 956 S RIDGECREST CIR, ANAHEIM, CA 92807 Legal Description: N TR 8516 BLK LOT 18 APN: 36519318 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 •5153 Project Description: Electrical for (1) Residential EV Charger located inside the garage Living Area: Garage Area: CarportArea. Balcony / Deck Area. Cool Roof: Number of Stories: t Valuation: Construction Types: Occupancy Groups: Fire Sprinklered. Total Fees paid for Permit: People Associated with Project: Contractor FYV ELECTRIC 650 N ROSE DR 390 PLACENTIA, CA Permit Applicant William Hill Owner CHAN, ANTHONY BERNARD 956 S RIDGECREST CIR 0,00 NIA 177.00 Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: lumbing (Ground/Underfloor Drain Waste) lectrical Ground Electrode/Ufer Do not install subfloor or pour Gas srfloor Insulation (Raised Foundation r Nailing (Raised Foundation Only) Floor (Floor Nailing) , not cover or conceal the work below until Floor Shear 2nd Floor Shear Roof (Sheathing Duct(Mech Mechanical Electrical FINAL INSPECTIONS I DATE I INSPECTOR . All applicable items below must be signed before utilities are released Final Gas Test Electrical Final �• _ Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 7664126 Fire Sprinkler (ONLY) (714) 7654041 Fire Dept. Final (714) 765.5041 Water Engineering (714) 7654591 Sub List/Bus. Lie. (714) 7655194 (Allow 10 business days) COAIMigation Measures Building Final (714 765-S153) Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Penetrations (Ele, Mec & Lath Lath I Service Meter -(Meter will be set within 2-3 days after approval) Excludes New Plaster (Brown Cos iruct., Ele., or Mec.) Electrical Inspections Engineering Backflow (Testable Service