Loading...
996 S SIET PLPermit Types BLD ELE MEC FILM X Permit Number: BLD2024.02835 Issued: 06/03/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 125 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 996 S SIET PL, Anaheim, CA 92806 Legal Description: N TR 3706 BLK LOT 29 = - - APN:25339101 _ Project Description: Reroof to remove and install ( ) squares of composition shingles over house and attached garage Living Area: Number of Stories: 1 Valuation: 20,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: 352.60 People Associated with Project: Permit Applicant Fatemeh Ansan Owner ANSARI, FATEMEH TORAB 996 S SIET PL Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNnHgIM tq( City of Anaheim OQ iO Building DIVI$IDII JI�D OVNDED t$h�j Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 7654126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 7654041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable Hems have been sianed Building Final (714 765.5153) Last Inspection -Final Only After Above completed LI I r„ (-,nelbe�kyi Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane l inf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) i,111 xq tAEg i-Ygr1 Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill,miess sianed off) Sewer Water Engineering Backflow (Testable Only) Water Service