996 S SIET PLPermit Types
BLD ELE MEC FILM
X
Permit Number: BLD2024.02835
Issued: 06/03/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 125
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 996 S SIET PL, Anaheim, CA 92806
Legal Description: N TR 3706 BLK LOT 29
= - -
APN:25339101
_
Project Description: Reroof to remove and install ( ) squares of composition shingles over house and attached garage
Living Area: Number of Stories:
1 Valuation: 20,000.00
Garage Area:
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fees paid for Permit: 352.60
People Associated with Project:
Permit Applicant Fatemeh Ansan
Owner ANSARI, FATEMEH TORAB 996 S SIET PL
Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNnHgIM tq(
City of Anaheim OQ iO
Building DIVI$IDII JI�D
OVNDED t$h�j
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 7654126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 7654041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable Hems have been
sianed
Building Final (714 765.5153)
Last Inspection -Final Only After Above completed
LI I
r„
(-,nelbe�kyi
Plumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane l inf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned.
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
i,111
xq
tAEg
i-Ygr1
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill,miess sianed off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service