540 S PASEO LUCERO (3)r
Permit Types
BLD
1 ELE
MEC
PLm
X
X
Permit Number: BLD2024-03426
Issued: 09/26/2024
www.anaheim.net/building
(714)7654626
Quarter Section: 198
Site Address: 540 S PASEO LUCEROANAHEIM, CA 92807
Legal Description: N TR 8455 BLK LOT 5
APN: 36517133
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Retaining Wall: Legalize 64 In. ft. X 4. ft. high retaining wall. REF: INV2024-00156
Living Area: Number of Stories: 0 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Parma:
People Associated with Project
15,750.00
VB
No
1,440.22
Contractor
PINO FIORI CONSTRUCTION
14311 NEWPORT AVE #G220 TUSTIN, CA 92780
Owner
HEINRICH, CHRIS
540 S PASEO LUCERO
Engineer - Goo -Technical
John Donovan
485 Corporate Drive, Suite B Escondido, CA 92029
Engineer - Civil
Karr an Maoyedi
26180 Enterprise Way, #300 Lake Forest, CA 92630
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Water Distribution 2
The permit shall expire by limitation and become null and Vold If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PN?I EIM (-�C
Cityof Anaheim O� iO
Building Division i
>
• �OVNDED vefl^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
( i
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 766.5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lie. (714) 7655194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)?
pjzt
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 7655153)
Last Inspection -Final Only After Above Completed
'Z
GR
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragmlFrame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
.t
y iA4 P A r-y L 4 rs40-rA
Framing (Only after Plbg., Ele., Mac. & Fire)`
Insulation(Sound/Energy)
nn�
cPLL, FnrKL ter*VIJ CtOIAL tp lNS-v1u,1�i 11.
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service