120 N TIANA LN (3)Permit Types
BLD 1 ELE MEC PLM CITY OF ANAHEIM -
X
BUILDING DIVISION
Permit Number: BLD2022-05022 200 S. ANAHEIM BLVD.
Issued: 09/23/2024 (714) 766 - 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 179
Site Address: 120 N TIANA LN, ANAHEIM, CA 92807
Legal Description: N TR 5230 BLK LOT 24
APN: 35803224
Project Description: Retaining Walls: 68 If. x 4'8 ft high retaining wall.
Living Area: Number of Stories: 1 Valuation: 10.000.00
Garage Area: Construction Types: VB
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinkiered:
Cool Roof, Total Fees paid for Permit: 2,511.27
People Associated with Project:
Permit Applicant Jason Dimaggio
Owner DIMAGGIO JASON 8 KIMBERLEY MAE 120 N TIANA LN
Engineer- Civil TODD L LACHER 1201 N TUSTIN AVE200502181356460480 ANAHEIM, CA 92807
Type Electrical Fixtures Dry Type Plumbing Fixtures Oty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PHEIM
Cityof Anaheim D4P� 9� o
Building Division Z
• DVNDED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (GroundlUnderfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground ElectrodelUfer
Sub LIsVBus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklFormsn'renches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Z�
Plumbing(GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Bui din.., Inspections
ie t k Lt� • lu�w rn
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
1--r
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragmlFrame)
Masonry (Reinf.IBond Beam/Pre-Grout)
(?
of-�
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mel & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Ii
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service