Loading...
953 S PEPPER ST BPermit Types LLD ELE MEC PLM X X X X Permit Number: BLD2019-04001 Issued: 03/25/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 64 Site Address: 953 S PEPPER ST B (Second Unit) Legal Description: N TR 1620 LOT 22 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: (ADU) - Residenital Addition: 462 sci ft to convert existing detached garage into studio accessory dwelling unit. REF: BLD2019-04003 Living Area: 462 Dwelling Units: 1 Valuation: $20,000.00 Construcion Types: VB, , Fire Spdnklemd? No Cool Roof No Total Fees paid for Permit: 2,957.88 People Associated with Project: Engineer MOKSUDUR RAHMAN 6939 SCHAEFER AVE D-170 CHINO CA 91710 Owner FRANCISCO ROSAS 953 S PEPPER ST ANAHEIM CA 92802 Type Electrical Fixtures New or total rewire - 1 or 2 family Qty Type Plumbing Fixtures 400 Shower Lavatory Water Closet Kitchen Sink Garbage Disposal Repair/Drainage Alteration/Vent Piping Water Distribution City Type Mechanical Fixtures Qty 1 Ventilation Fan - <= 300 cfm on single duct 2 1 Residential Registers 1 1 Heating Appliances, including vent 1 1 Heating/Cooling Coil 1 1 Compressor/Boiler - up to 15 hp 1 1 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. N P"Elm cq Cityof Anaheim o� P C O\\ Building Division'" �21 ln� a; ��� - _ �•./ �OVNoeo ta`'^• Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 'dy �C Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable itethaveeen signed: ire Dept.Final (714) 765-5041 Plumbing (Ground(Underfloor Drain Waste) ater Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lie. (714) 765.5194 (Allow 10 business days) Setback/Forms/rrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable i[e s have been Building Final (714 765-5153) last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildin Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) �}�((1447 Floor Nailing (Raised Foundation Only) � S 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinfJBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plu ina Ins ections Framing (Only after P)bg., Ele., Mec. & Fire) b;L Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (On not harkf 11 unless sr aned off) Sewer Water Engineering Backflow (Testable Only) Water Service