Loading...
333 W CERRITOS AVE (8)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024.01744 Issued: 07116/2024 www.anaheim.net/building (714)7654626 Quarter Section: 87 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 333 W CERRITOS AVE, ANAHEIM, CA 92805 Legal Description: P BK 131 PG 1 PAR 1 PM 131-1 PAR 1 POR OF PAR APN: 08221403 Project Description: Antenna Cell Site: Modification to existing cell site for "AT&T". Living Area: Number of Stones: 0 Valuation: 25,000.00 Garage Area: Construction Types: N/A CarportArea: Occupancy Groups: Balcony I Dock Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 1,074100 People Associated with Project: Contractor R D ENGINEERING &AMP; CONSTRUCTION INC 1660 N MAGNOLIA AVENUE201409240923402968 EL CAJON, CA 92020 Permit Applicant Johnathon Alfano Owner GREENLAW ABC TOWNHOMES LLC 18301 VON KARMAN AVE 250 Architect/Engineer JOHN N KABAK 520 S MAIN ST STE 2531 AKRON, OH 44311 Engineer - Civil JACOB S PROCTOR 651 W GALENA PARK BLVD STE 101 DRAPER, UT 84020 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures City The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. PNFNEtst �q< Cityof Anaheim OF 1O Building Division ' i I OVNDED '�h^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sipped 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Stmct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service