Permit Number: BLD2019-04003
Issued: 03/25/2021
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 64
Site Address: 953 S PEPPER ST
Legal Description: N TR 1620 LOT 22
d -0- 50
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Addition: 116 sq ft to construct new master bathroom. REF: BLD2019-04001
Living Area:
116
Valuation: $18,000.00
Construcion Types: VB, ,
Fire Sprinklered? No
Cool Roof No
Total Fees paid for Permit: 1,496.74
People Associated with Project:
Type Electrical Fixtures
Qty Type Plumbing Fixtures
Qty
Type Mechanical Fixtures Qty
Receptacle, switches, lights
7 Bath Tub
1
Ventilation Fan - <= 300 cfm on single duct 1
Lavatory
1
Water Closet
1
Repair/Drainage AlterationNent Piping
1
Water Distribution
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
P�PSEIM rqt
City of Anaheim
D4 io
Building Division F i
u a
D�NDED tga
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
�S
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the followna applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub ListBus. Lic. (714) 765-5194 (Allow, 10 business days)
Setback/Forma/Trenches (Footings)
COA/Migation Measures
Do not install subtloor or pour floor slab until the follwing applicable items have been
sinned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
/ -
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
m1s�p c}�t L
st
��f
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirders)
No c
y
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. EIe.. Mec. & Fire)
04
Insulation (Sound/Energy)
:*
—
Do not tape or plaster until the following applicable items have been signed:
Drywall
1
Drywall Penetrations (EIe, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., EIe., or Mec.)
Grease Interceptor
(Do not hankf 11,mlegs % dried off)
Sewer
Water Engineering Back1low (Testable Only)
Water Service