Loading...
953 S PEPPER ST (5)Permit Types BLD ELE MEC FILM X X X X Permit Number: BLD2019-04003 Issued: 03/25/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 64 Site Address: 953 S PEPPER ST Legal Description: N TR 1620 LOT 22 d -0- 50 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Addition: 116 sq ft to construct new master bathroom. REF: BLD2019-04001 Living Area: 116 Valuation: $18,000.00 Construcion Types: VB, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 1,496.74 People Associated with Project: Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights 7 Bath Tub 1 Ventilation Fan - <= 300 cfm on single duct 1 Lavatory 1 Water Closet 1 Repair/Drainage AlterationNent Piping 1 Water Distribution 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PSEIM rqt City of Anaheim D4 io Building Division F i u a D�NDED tga Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final �S Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the followna applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListBus. Lic. (714) 765-5194 (Allow, 10 business days) Setback/Forma/Trenches (Footings) COA/Migation Measures Do not install subtloor or pour floor slab until the follwing applicable items have been sinned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed / - Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections m1s�p c}�t L st ��f Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) No c y Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. EIe.. Mec. & Fire) 04 Insulation (Sound/Energy) :* — Do not tape or plaster until the following applicable items have been signed: Drywall 1 Drywall Penetrations (EIe, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., EIe., or Mec.) Grease Interceptor (Do not hankf 11,mlegs % dried off) Sewer Water Engineering Back1low (Testable Only) Water Service