502 N BRODER ST BPermit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2024-05117
Issued: 10/11/2024
www.anaheim. netibu ilding
(714)765-4626
Quarter Section: 13
Site Address: 502 S BRODER ST B, Anaheim, CA 92804
Legal Description: N TR 2655 BLK LOT 83
APN: 12611308
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
NPN EIM cl,
Project Description: Residential Addition: 40 sq. ft. to convert portion of garage into new laundry and utility room. REF:BLD2023-06077/
-06079
Living Area: Number of Stories: 1 Valuation:
Garage Area: Consiruction Types:
Carpon Area. Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roof: Total Fear paid for Permit:
People Associated with Project:
Contractor MODERN MUSE CONSTRUCTION INC 12606 HOOVER STREET GARDEN GROVE, CA 92841
Permit Applicant Giang Vo 418 S Falcon St Anaheim, CA 92804
Owner VO GIANG SON 502 S Broder St.
40,000.00
VB
0.00
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Oty,
Receptacle, switches, lights 3 Gas System (outlets) 1 Ventilation Fan - <= 300 cfm on single duct 1
Washing Machine Rough
Water Heater
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
t4f:ity of Anaheim PNPttEIM C.
DQ �0
Building Division F y
>
�o�NDEo tsy
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.5126
INSPECTION
I DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrodelUfer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed -
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildina Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/DiaphragmlFrame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
/I