260 S VIA MONTANERA (5)Permit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2024.01177
Issued: 05/15/2024
CITY OF ANAHEIM
www.anaheim. neVbuild i ng
(714)765-4626
Quarter Section: 197
Site Address: 260 S VIA MONTANERAANAHEIM, CA 92807
Legal Description: N TR 9217 BLK LOT 7
APN: 35624207
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
'A � s.
Project Description: Residential Remodel: 560 sq ft remodel - First floor: kitchen, create new powder room with exterior shower, laundry,
relocate (1) slider and relocate existing bathroom #1 door - Second floor. primary suite. 111 sq ft second floor deck with 110 sq ft covered
patio below.
Living Area:
Number of Stones:
2 Valuation: 65,000.00
Garage Area:
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
ill
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit: 3.652.03
People Associated with
Project:
Permit Applicant
ISRAEL MARRA ESTRADA
1251 9TH STREET IMPERIAL BEACH, CA 91932
Owner
HARDING, RON & SANDY
260 S VIA MONTANERA
Contractor
ABI CONSTRUCTION AND REMODEL INC
1251 9TH STREET IMPERIAL BEACH, CA
Engineer - Civil
Fernando C Medina
1051 S. Holt F Los Angeles, CA 90035
Type Electrical Fixtures Qty Type Plumbing Fixtures Q
New or total rewire -1 or 2 family 550 Bath Tub
Receptacle, switches, lights
45 Dishwasher
Garbage Disposal
Kitchen Sink
Lavatory
Repair/Drainage AlterationNent Piping
Sewer per 100 ft.
Shower
Washing Machine Rough
Water Closet
Water Distribution
Water Heater
Water Main per 100 ft.
City Mechanical Fixtures Qly
1 Condenser 1
i Heating/Cooling Coil 1
1 Ventilation Fan - <= 300 cfm on single duct 3
1
1
1
1
1
1
1
1
1
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
'HPHEIM �q<
Cityof Anaheim 04 iO
Building Division _ z
>
�OUVOEV Na^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
(C
Plumbing Final
Mechanical Final
Cross Connection Control (714) 766.4280
Engineering Final (714) 765-6126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 7654041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
_711/y1
ofZ�
COAIMigation Measures
Do not install subfloor or pour floor slab until the folWng applicable items have been
sianed
Building Final (714 765-5153)
last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections -�"
7�/� �)�-1 -r Alap ,S k"I fin �0.ry. (- Wt,
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
i I A'
Rough Electrical
7 97T
JB m-
Rough COAIMitagation Measures
Plumb' I11 InIs1 ections
U..
7 3 7}{ df( y A ljtg�
Framing (Only after Plbg_ EleMec. & Fire)
% (
qrZ'
Insulation(Sound/Energy)
Till 7i1
or-&
ar 0 d( 0 �-
Do not tape or plaster until the following applicable items have been signed:
Drywall
7 fS
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
7/I S/
Exterior Lath
1 E
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sinned offi
Sewer
Water Engineering Backflow (Testable Only)
Water Service