Loading...
260 S VIA MONTANERA (5)Permit Types BLD ELE MEC PLM X X X X Permit Number: BLD2024.01177 Issued: 05/15/2024 CITY OF ANAHEIM www.anaheim. neVbuild i ng (714)765-4626 Quarter Section: 197 Site Address: 260 S VIA MONTANERAANAHEIM, CA 92807 Legal Description: N TR 9217 BLK LOT 7 APN: 35624207 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765. 5153 'A � s. Project Description: Residential Remodel: 560 sq ft remodel - First floor: kitchen, create new powder room with exterior shower, laundry, relocate (1) slider and relocate existing bathroom #1 door - Second floor. primary suite. 111 sq ft second floor deck with 110 sq ft covered patio below. Living Area: Number of Stones: 2 Valuation: 65,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: ill Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 3.652.03 People Associated with Project: Permit Applicant ISRAEL MARRA ESTRADA 1251 9TH STREET IMPERIAL BEACH, CA 91932 Owner HARDING, RON & SANDY 260 S VIA MONTANERA Contractor ABI CONSTRUCTION AND REMODEL INC 1251 9TH STREET IMPERIAL BEACH, CA Engineer - Civil Fernando C Medina 1051 S. Holt F Los Angeles, CA 90035 Type Electrical Fixtures Qty Type Plumbing Fixtures Q New or total rewire -1 or 2 family 550 Bath Tub Receptacle, switches, lights 45 Dishwasher Garbage Disposal Kitchen Sink Lavatory Repair/Drainage AlterationNent Piping Sewer per 100 ft. Shower Washing Machine Rough Water Closet Water Distribution Water Heater Water Main per 100 ft. City Mechanical Fixtures Qly 1 Condenser 1 i Heating/Cooling Coil 1 1 Ventilation Fan - <= 300 cfm on single duct 3 1 1 1 1 1 1 1 1 1 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. 'HPHEIM �q< Cityof Anaheim 04 iO Building Division _ z > �OUVOEV Na^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final (C Plumbing Final Mechanical Final Cross Connection Control (714) 766.4280 Engineering Final (714) 765-6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7654041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) _711/y1 ofZ� COAIMigation Measures Do not install subfloor or pour floor slab until the folWng applicable items have been sianed Building Final (714 765-5153) last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections -�" 7�/� �)�-1 -r Alap ,S k"I fin �0.ry. (- Wt, Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical i I A' Rough Electrical 7 97T JB m- Rough COAIMitagation Measures Plumb' I11 InIs1 ections U.. 7 3 7}{ df( y A ljtg� Framing (Only after Plbg_ EleMec. & Fire) % ( qrZ' Insulation(Sound/Energy) Till 7i1 or-& ar 0 d( 0 �- Do not tape or plaster until the following applicable items have been signed: Drywall 7 fS Drywall Penetrations (Ele, Mec & Plbg) Interior Lath 7/I S/ Exterior Lath 1 E Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sinned offi Sewer Water Engineering Backflow (Testable Only) Water Service