943 S FLINT RIDGE WAY (4)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-06416
Issued: 12/09/2024
www.analreim.net/building
(714)765-4626
Quarter Section: 220
CITY OF ANAHEIM
Site Address: 943 S FLINT RIDGE WAY, ANAHEIM, CA 92808
Legal Description: N TR 13494 BLK LOT 4
APN: 35436226
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Project Description: Reroof: To relay (20) squares of existing heavyweight tile over house and attached garage
—:t
Living Area:
Number of Stories:
1 Valuation: 7,500.00
Garage Area:
Construction Types: Ve
Carport Area:
Ocapancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fee. paid for Pemiit: 494.98
People Associated with
Project:
Contractor
CERTIFIED ROOFING SPECIALISTS
9281 LARKSPUR DRIVE201106221436272010 WESTMINSTER, CA 92683
Permit Applicant
JOSE VAZQUEZ
9281 LARKSPUR DR WESTMINSTER, CA 92683 0000
Owner
NIKOUI, HOSSEIN REZA TR
943 S FLINT RIDGE WAY
Type Electrical Fixtures oty Type Plumbing Fixtures City Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
NN EIM cd
Cityof Anaheim OF P ('�O
Building Division a
Z
• �00NDED %*
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5153)
Last Inspection -Final Only Aker Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
i q
p(-
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Pibg., Ele_ Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service