Permit Number: BLD2023-01403
Issued: 08/02/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 48
Site Address: 645 S HACIENDA ST B, Anaheim, CA 92804
Legal Description: N TR 2425 BLK LOT 100
APN: 12822410
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: (ADU) Residential Addition: 420 sq ft attached garage converted to accessory dwelling unit. (1BD/1BA)
Living Area: 420 Number of Stones: 1 Valualion:
Garage Area: Construction Types:
Carport Area: 0cmpancy Groups:
Balcony I Deck Area: Fire Spnnklered:
Cool Roof Total Fees paid for Permit:
People Associated with Project
50.000.00
VB
2,349.50
Permit Applicant Ulises Ibarra
901 W Ken Way Anaheim, CA 92805
Owner IBARRA ULISES
901 W KEN WAY
Type Electrical Fixtures
Oty Type
Plumbing Fixtures Qty Mechanical Fixtures
Qly
Receptacle, switches, lights
30 Garbage Disposal
1 Air Handling Units
I
Sub Panel/Temp Pwr - Under 600 V, up to
1 Kitchen Sink
1 Evaporative Cooler (not portable)
1
200 amps
1 Heating Appliances, including vent
1
Lavatory
Ventilation Fan - -= 300 chin on single duct
2
Sewer per 100 ft.
1
Shower 1
Water Closet 1
Water Heater 1
Water Main per 100 0. 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
.PC/P EIM Cq<
City of Anaheim o° io
Building Division i=I i
. �UNp ED ye`'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
G
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwmg applicable items have been
signed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
_
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned,!
list Floor Shear
7
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele_ Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items ave been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service