502 BRODER ST BPemlit Types
BLD
ELE
MEC
PLM
X
X
I X
X
Permit Number: BLD2023-06077
Issued: 07/18/2024
www.anaheirrunet/building
(714)765-4626
Quarter Section: 13
Site Address: 502 S BRODER ST B, Anaheim, CA 92804
Legal Description: N TR 2655 BLK LOT 83
APN: 12611308
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 -5153
Project Description: (JADU) Residential Addition: 410 sq. ft. to convert attached garage into accessory dwelling unit. (tbdrm/1 bth) REF:
BLD2023-06079.
Living Area: 410 Number of Stories: 1 Valuation:
Garage Area: Construction Types:
CarportArea
Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool RoofTotal Fees paid for Permit:
People Associated with Project
Permit Applicant Giang Vo 418 S Falcon St Anaheim, CA 92804
Owner VO GIANG SON 502 S Broder St.
Contractor MODERN MUSE CONSTRUCTION INC 12606 HOOVER STREET GARDEN GROVE, CA 92841
Engineer - Civil Michael M Phillips 17342 Roseleaf ave Tustin, CA 92780
Type Electrical Fixtures
City Type Plumbing Fixtures
Cry
New or total rewire - 1 or 2 family
410 Garbage Disposal
1
Sub Panel/Temp Pwr - Under 600 V, up to
2 Gas System (outlets)
1
200 amps
Kitchen Sink
'I
Lavatory
1
Repair/Drainage AlterationNent Piping
1
Sewer per 100 ft.
1
Shower
i
Water Closet
1
Water Distribution
1
Water Heater
1
Water Main per 100 ft.
1
40,000,00
VB
2,921.98
Mechanical Fixtures City
Gas System (outlets) i
Mini Split (Exterior condenser) 1
Mini Split (room unit) 1
Ventilation Fan - <= 300 cm on single duct 2
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
•sR
sr
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
INSPECTION I DATE I INSPECTOR
Do not pour concrete until the following applicable items have been signed:
lumbing (GroundfUnderfloor Drain Waste)
lectrical Ground ElectrodelUfer
install subfloor or pour
(Ground/Underfloor
r Rough Gas
Insulation (Raised Foundation
Ig (Raised Foundation Only)
applicable
2nd Floor (Floor Nailing)
Do not cover r oconceal the work below until the following applicable items have
1st Floor Shear
Floor Shear
Duct (Mach
Mechanical
Electrical
Rough COAIMitagation Measures
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Do not tape or plaster until the following applicable items have been signed.
Penetrations (Ele, Mae & Plbg)
Lath
Lath
it Service Meter -(Meter will be set within 2-3
days after approval) Excludes New
Exterior Plaster(Brow
T-Bar (Struct., Ele., or
Sewer
FINAL INSPECTIONS I DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final • 1 - S
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765.5041
Water Engineering (714) 7653591
Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days)
COAIMigation Measures
Building Final (714 765.5153)
Last Inspection -Final only After Above completed
PARTIAL INSPECTIONS
Building Inspections
Mechanicallnspections
Plumbing Inspections
Electrical Inspections
Service
Backflow, (Testable