929 S GUMWOOD LN (2)Permit Types
BLD
1 ELE
MEC
PLM
X
X
I X
Permit Number: BLD2024-04963
Issued: 07/21/2024
www.anaheim.net/bui (ding
(714)765-4626
Quarter Section: 114
Site Address: 929 S GUMWOOD LN, ANAHEIM, CA 92806
Legal Description: N TR 7878 BLK LOT 10
APN: 25311410
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: Legalize construction of wall with electrical to create new bedroom #3 from portion of
bedroom #2. (REF: INV2023-000621 BLD2024-01445)
Living Area; Number of Stories: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spnnklered:
Cool Roof: Total Fees paid for Permit:
People Associated with Project:
Contractor DAVID B MC CAULEV CONSTRUCTION 2851 ROLLING HILLS DRIVE #196201406131155518666 FULLERTON, CA 92835
Owner ORTIZ, JOSE LUZ RAMON 929 Gumwood Ln.
6.500.00
VB
No
111.00
Type Electrical Fixtures Cry Type Plumbing Fixtures City Mechanical Fixtures Oty
Receptacle, switches, lights 4 Residential Registers (ducts) 2
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
ANpH Elm-
Cityof Anaheim OF iO
Building Division _� i
• �OVN DEO vay^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE I
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
�7 r
Cross Connection Control (714) 765-4280
Engineering Final (714) 7655126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 766.6041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Undernoor Drain Waste)
Water Engineering (714) 765.4691
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
t
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-6153)
Last Inspection -Final Only After Above Completed
�y I
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdew)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
A-21 4
I fUL—
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mee. 8 Fire)
tplt_y(
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
+�
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sioned off)
Sewer
Water Engineering Backnow (Testable Only)
Water Service