Loading...
917 W ALBERTA ST (8)Permit Types CITY OF ANAHEIM BLD ELE MEC PLM X X BUILDING DIVISION Permit Number: BLD2024-05000 200 S. ANAHEIM BLVD. Issued: 09/20/2024 4714) 765 - 5153 wwvv.anaheim.net/building (714)765-4626 Quarter Section: 62 Site Address: 917 W ALBERTA ST, Anaheim, CA 92805 Legal Description: N TR 1119 BLK LOT 7 APN: 25510240 Project Description: Residential Photovoltaic System - Microinverter (without ESS) Living Area: Number of Stories: Valuation: Garage Area: ConaWction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered. Cool Roof: Total Fees paid for Permlt People Associated with Project: Contractor ECONO AIR 1921 PETRA LANE PLACENTIA, CA 92821 Permit Applicant MANUEL GARCIA Type Electrical Fixtures Oly Type Plumbing Fixtures Oly Microinverter 4 �dZ 10.000.00 177.00 Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PaPtiE1M r.,` Cityof Anaheim O4 i0 Building Division F i U > DVNDED � Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final �Ilq li Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 76"194 (Allow 10 business days) SetbacklFormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765.5153) Last Inspection -Final Only After Above Completed ,21 �l n IVY Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1 st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hackf 11 unless sr oned off) Sewer Water Engineering Backflow (Testable Only) Water Service