Loading...
113 W LA PALMA AVE (2)Types �- 60 CITY OF ANAHEIM E MEC PLM ' X X BUILDING DIVISION It Number: BLD2022-01798 200 S. ANAHEIM BLVD. 10 sued: 06/02/2023 (7141765 - 5153 www.anaheim.net/buiding (714)7654626 Quarter Section: 70 Site Address: 113 W LA PALMA AVE, ANAHEIM, CA 92801 Legal Description: N TR 17846 BLK LOT 1 TRACT NO 17846 LOT 1 FOR OF L APN: 26715134 Project Description: New Commercial Construction: Construct 442 sq.ft pool building with men and women restroom, showers, storage and 138 sq.ft breezeway. TRACT 17846 REF: BLD2022-01801 Trash Enclosure Living Area: Number of Stories: 1 Valuation: 90,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: U1, Ui Balcony / Deck Area: Fire Sprinklered: Cool RoofTotal Fees paid for Permit: 5,628.38 People Associated with Project: Contractor LENNAR HOMES OF CALIFORNIA LLC 2000. FIVEPOINT 3RD FLOOR201407011155160905 IRVINE, CA 92618 Permit Applicant Amy LolaWeaver Owner LENNAR HOMES OF CALIFORNIA INC 15131 ALTON PKWY 365 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Oty Meter/Disc Sw - Under 600 V, up to 200 1 Drinking Fountain i amps Garbage Disposal 1 Receptacle, switches, lights 37 Sub Panel/Temp Pwr - Under 600 V. up to 2 Lavatory 2 200 amps Private Sewage Disposal 1 Shower 2 Urinal 1 Water Closet 1 Water Heater 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PHEIM , Cityof Anaheim o� iO Building Division h i U > �ovNDED tsry^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/BUs. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been stoned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear rl �� -J56 Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) sG Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed, Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath I a 3 .(S'G Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service