Loading...
223 W SIMMONS AVE (3)Permit Types BLD EL MEC PLM X X X X Permit Number: BLD2020-02152 Issued: 11/30/2021 www,anaheim.net/building (714)7654626 Quarter Section: 89 Site Address: 223 W SIMMONS AVE, ANAHEIM, CA 92802 Legal Description: N TR 2520 LOT 87 APN:23309413 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (771114)H7665^/511153 kV — �PNPNEIMI O a� Project Description: Residential Addition: 443 sq. ft. to extend master bedroom and kitchen and construct new master bathroom with walk in closet. REF:INV2020-00056 Living Area: 195 Number of Stories: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Feas paid for permit; People Associated with Project: Permit Applicant Rajveer Yadav Owner Rajveer Yadav 233 W Simmons 40,000.00 VB No 3,072.85 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Qty New or total rewire -1 or 2 family 443 Bath Tub 1 Ventilation Fan - <= 300 cm on single duct 2 Receptacle, switches, lights 74 Dishwasher i Garbage Disposal 1 Gas System (outlets) i Kitchen Sink 1 Lavatory 2 Repair/Drainage Alteration/Vent Piping 1 Sewer per 100 ft. 1 Water Closet 1 Water Distribution 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �aPHEIM ��C City of Anaheim o4 iO Building Division f' 2 u a �D6NDED t Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final MLSS N Mechanical Final 31 Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloot or pour floor slab until the follwing applicable items hAve been sianed Building Final (714 765-5163) Last Inspection -Final Only After Above Completed 3 �Z-S "174+ir Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Refill.) r a - Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear /% 711 Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragm/Frame) V� Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) VVIV Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Flog Ele Mec 8 Fire) Insulation (Sound/Energy) z 2, . Z L Do not tape of plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec 8. Plbg) Interior Lath Exterior Lath 1/ Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service