917 S HAMPSTEAD ST (3)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2025-00343
Issued: 01/23/2025
www.anaheim.net/building
(714)7654626
Quarter Section: 64
Site Address: 917 S HAMPSTEAD ST ANAHEIM, CA 92802
Legal Description: N TR 1421 BLK LOT 13
APN: 03607109
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 •5153
Project Description: Reroof. To remove and install (24) squares of composition shingles and (4) squares of flat roof torch down over
house and attached garage
Living Area:
Number of Stories:
1 Valuation:
25,000.00
Garage Area:
Construction Types:
VB
CarportArea:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit:
362.25
People Associated with Project:
Contractor
AMERICAN JR ROOFING CORP
6600 BEOUETTE AVENUE PICO RIVERA, CA
Permit Applicant
Angelina Marroquin
Owner
CARPIO, JUAN JOSE & ROSA ELIA
917 S HAMPSTEAD ST
Type
Electrical Fixtures City Type
Plumbing Fixtures City Mechanical Fixtures
Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
NPHEIM c�
City of Anaheim o4P �!O
Building Division _� ?
• Ic DIED BhA
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the followwng applicable items have
been sinned.
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele.. Mec. 8 Fire)
Insulation (Sound/Energy)
f`o not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service