Loading...
125 N RESH ST (3)Permit Types BLD ELE MEC PLM X Permit Number: BL02025-00386 Issued: 01/27/2025 www.anaheim.net/building (714)765-4626 Quarter Section: 72 Site Address: 125 N RESH STANAHEIM, CA 92805 Legal Description: A TR RESHS SUB BLK 3 LOT 5 APN: 25505313 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: Remove and install (19) sq of composition shingles and (2) sq of flat roof on the house only Living Area: Numberof Stories: 1 Valuation: 12,600.00 Garege Area: Constroction Types: N/A Carport Area: occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Caul Roof. Total Fees paid for Permh: 360.63 People Associated with Project: Contractor SKY TECH ROOFER INC 1046 WN 20TH ST #3202012091152158375 LOS ANGELES. CA 90007 Permit Applicant Edgar Ulloa Owner DAVID & LYNDA NATH LLC 115 N RESH ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PHEIM �q< Cityof Anaheim 04 iO Building Division i > • �OVA'D ED tad^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-6126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lie. (714) 7654194 (Allow 10 business days) Setback/Formsfrrenches (Footings) COAIMigation Measures Do not install subtloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Wy Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not Cover or conceal the work below until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) i I C � Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Mr, hackfill unless sinned nffi not Sewer Water Engineering Backflow (Testable Only) Water Service