125 N RESH ST (3)Permit Types
BLD ELE MEC PLM
X
Permit Number: BL02025-00386
Issued: 01/27/2025
www.anaheim.net/building
(714)765-4626
Quarter Section: 72
Site Address: 125 N RESH STANAHEIM, CA 92805
Legal Description: A TR RESHS SUB BLK 3 LOT 5
APN: 25505313
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Remove and install (19) sq of composition shingles and (2) sq of flat roof on the house only
Living Area:
Numberof Stories:
1 Valuation: 12,600.00
Garege Area:
Constroction Types: N/A
Carport Area:
occupancy Groups:
Balcony / Deck Area:
Fire Spnnklered:
Caul Roof.
Total Fees paid for Permh: 360.63
People Associated with
Project:
Contractor
SKY TECH ROOFER INC
1046 WN 20TH ST #3202012091152158375 LOS ANGELES. CA 90007
Permit Applicant
Edgar Ulloa
Owner
DAVID & LYNDA NATH LLC
115 N RESH ST
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�PHEIM �q<
Cityof Anaheim 04 iO
Building Division i
>
• �OVA'D ED tad^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-6126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lie. (714) 7654194 (Allow 10 business days)
Setback/Formsfrrenches (Footings)
COAIMigation Measures
Do not install subtloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Wy
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not Cover or conceal the work below until the following applicable items have
been sianed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
i
I C �
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Mr, hackfill unless sinned nffi
not
Sewer
Water Engineering Backflow (Testable Only)
Water Service