700 S JANSS ST (4)Permit Types
BLD ELE MEC PLM
X
Permit Number: BL02025-00303
Issued: 01/21/2025
v✓\+rvy.anahei m.net/building
(714)765-4626
Quarter Section: 73
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5163
Ske Address: 700 S JANSS ST ANAHEIM CA 92805
Legal Description: N TR 1453 BILK LOT 64
APN: 03617308 - _
AMML
Project Description: Reroof. Remove and install (13) sq of composition shingles over the
house and attached garage and (7) sq of flat
roof
Living Area: Number of Stories:
1 Valuation: 15,000.00
Garage Area:
Construction Types: N/A
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklened:
Cool Roar:
Total Fees paid for Permit: 361.95
People Associated with Project:
Permit Applicant Chades Pham
Owner PHAM,CHARLES
Type Electrical Fixtures Qly Type Plumbing Fixtures Qly Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
�NP,HEIM �q<
Cityof Anaheim 04 io
Building Division _� i
• NDEO t8b^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7665041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 766.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 7655153)
Last Inspection -Final Only After Above Completed
Z j D
I[JJCIr
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
lfw ZY
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec 8. Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days -.• :; nrovap Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele.. or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service