Loading...
700 S JANSS ST (4)Permit Types BLD ELE MEC PLM X Permit Number: BL02025-00303 Issued: 01/21/2025 v✓\+rvy.anahei m.net/building (714)765-4626 Quarter Section: 73 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5163 Ske Address: 700 S JANSS ST ANAHEIM CA 92805 Legal Description: N TR 1453 BILK LOT 64 APN: 03617308 - _ AMML Project Description: Reroof. Remove and install (13) sq of composition shingles over the house and attached garage and (7) sq of flat roof Living Area: Number of Stories: 1 Valuation: 15,000.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklened: Cool Roar: Total Fees paid for Permit: 361.95 People Associated with Project: Permit Applicant Chades Pham Owner PHAM,CHARLES Type Electrical Fixtures Qly Type Plumbing Fixtures Qly Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �NP,HEIM �q< Cityof Anaheim 04 io Building Division _� i • NDEO t8b^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7665041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 766.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 7655153) Last Inspection -Final Only After Above Completed Z j D I[JJCIr Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) lfw ZY Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec 8. Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days -.• :; nrovap Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele.. or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service