333 S DISNEY WAYI "
Permit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: OLD2025.00051
Issued: 01/24/2025
www.anaheim.net/building
(714)765-4626
Quarter Section: 87
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Site Address: 333 W DISNEY WAY ANAHEIM, CA92802
Legal Description: N TR 190 BLK LOT 20 TR 190 LOT 20 FOR OF LOT AND
APN: 08221104 - - -
Project Description: DLR - Pumba Lot - Disneyland Half Marathon - Miscellaneous: Install (1) truss, (1) directional tower, (2) truss arches
and (1) cable bridge anchored to concrete ballast blocks. Electrical for (4) temp generators. (01-24-251hru 02-02-25)
Living Area: Number of Stories: 0 Valuation 25,OOD.00
Garage Area: Construction Types: WA
CarportArea: Ocwpancy Groups:
Balcony / Deck Area: Fire Spdnklered:
Cool Roof. Total Fees paid for Permh: 1,881.00
People Associated with Project:
Owner MDMP CORPORATION WALT DISNEY WORLD PO BOX 5046
Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Oty
Generators(Trensformers -1 to 10 hp, 1 2
to 75 kva.
Generators/Transformers - over 10 hp,
over 75 kva
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PaPHEtM cq`
Cityof Anaheim g4 iO
Building Division ti Z
�DUNDEp vb
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654691
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
/
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
hppn
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing iOnly after Plbg_ Fie ptec 8 Fire)
P4;
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
00 W H E E L E R & G R A Y, I N C
CONSULTING ENGINEERS
Field Observation Report
BLD2025-00051
DATE: January 29, 2025
SUBJECT: Disneyland Resort
333 W. Disney Way, Anaheim, CA 92806
Disneyland Half -Marathon
FROM: Ken Agee
REMARKS:
Phone #: (626) 893-4672
A structural observation was on performed at the project site to review the installation of the
temporary platforms, stages, speaker towers, cable bridge and start and finish arches at the
Disneyland Resort for the Disneyland Half -Marathon event. Here are the comments in
regards to the construction:
1. The installation is constructed and installed in accordance with the approved design
drawings.
300 S. HARBOR BLVD., SUITE 1010 ANAHEIM CALIFORNIA • 92805 (714) 937-9100
laq
W H E E L E R & G R A Y, I N C
CONSULTING ENGINEERS
Field Observation Report
BLD2025-00051
DATE: January 29, 2025
SUBJECT: Disneyland Resort
1585 S. Manchester Avenue, Anaheim, CA 92806
Disneyland Half -Marathon
FROM: Ken Agee
REMARKS:
Phone #: (626) 893-4672
A structural observation was on performed at the project site to review the installation of the
temporary platforms, stages, speaker towers, cable bridge and start and finish arches at the
Disneyland Resort for the Disneyland Half -Marathon event. Here are the comments in
regards to the construction:
1. The installation is constructed and installed in accordance with the approved design
drawings.
300 S. HARBOR BLVD., SUITE 1010 • ANAHEIM CALIFORNIA • 92805 (714) 937-9100