Loading...
333 S DISNEY WAYI " Permit Types BLD ELE MEC PLM X X Permit Number: OLD2025.00051 Issued: 01/24/2025 www.anaheim.net/building (714)765-4626 Quarter Section: 87 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Site Address: 333 W DISNEY WAY ANAHEIM, CA92802 Legal Description: N TR 190 BLK LOT 20 TR 190 LOT 20 FOR OF LOT AND APN: 08221104 - - - Project Description: DLR - Pumba Lot - Disneyland Half Marathon - Miscellaneous: Install (1) truss, (1) directional tower, (2) truss arches and (1) cable bridge anchored to concrete ballast blocks. Electrical for (4) temp generators. (01-24-251hru 02-02-25) Living Area: Number of Stories: 0 Valuation 25,OOD.00 Garage Area: Construction Types: WA CarportArea: Ocwpancy Groups: Balcony / Deck Area: Fire Spdnklered: Cool Roof. Total Fees paid for Permh: 1,881.00 People Associated with Project: Owner MDMP CORPORATION WALT DISNEY WORLD PO BOX 5046 Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Oty Generators(Trensformers -1 to 10 hp, 1 2 to 75 kva. Generators/Transformers - over 10 hp, over 75 kva The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PaPHEtM cq` Cityof Anaheim g4 iO Building Division ti Z �DUNDEp vb Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654691 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed / Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have hppn 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing iOnly after Plbg_ Fie ptec 8 Fire) P4; Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service 00 W H E E L E R & G R A Y, I N C CONSULTING ENGINEERS Field Observation Report BLD2025-00051 DATE: January 29, 2025 SUBJECT: Disneyland Resort 333 W. Disney Way, Anaheim, CA 92806 Disneyland Half -Marathon FROM: Ken Agee REMARKS: Phone #: (626) 893-4672 A structural observation was on performed at the project site to review the installation of the temporary platforms, stages, speaker towers, cable bridge and start and finish arches at the Disneyland Resort for the Disneyland Half -Marathon event. Here are the comments in regards to the construction: 1. The installation is constructed and installed in accordance with the approved design drawings. 300 S. HARBOR BLVD., SUITE 1010 ANAHEIM CALIFORNIA • 92805 (714) 937-9100 laq W H E E L E R & G R A Y, I N C CONSULTING ENGINEERS Field Observation Report BLD2025-00051 DATE: January 29, 2025 SUBJECT: Disneyland Resort 1585 S. Manchester Avenue, Anaheim, CA 92806 Disneyland Half -Marathon FROM: Ken Agee REMARKS: Phone #: (626) 893-4672 A structural observation was on performed at the project site to review the installation of the temporary platforms, stages, speaker towers, cable bridge and start and finish arches at the Disneyland Resort for the Disneyland Half -Marathon event. Here are the comments in regards to the construction: 1. The installation is constructed and installed in accordance with the approved design drawings. 300 S. HARBOR BLVD., SUITE 1010 • ANAHEIM CALIFORNIA • 92805 (714) 937-9100