879 N REDONDO DR W (2)Permit Types
BLD I ELE MEC PLM
X
Permit Number: BLD2011-02204
Issued: 06/13/2011
CITY OF ANAHEIM
www.anaheim. neUbui (ding
(714)7654626
Quarter Section: 61
Site Address: 879 N REDONDO DR W , ANAHEIM, CA 92801
Legal Description: N TR 1460 LOT 14
APN: 03405307
Project Description: Mechanical to replace air conditioning unit.
Living Area.
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Root:
Number of Stones:
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Valuation:
0.00
Construction Types:
Not Applicable
Occupancy Groups:
Fire Sprinklered:
No
Total Fees paid for Permit:
136.73
People Associated with Project:
Contractor SERVICE CHAMPIONS PLUMBING HEATING 8A 3150 E BIRCH ST200205291032294650 BREA, CA 92821
Permit Applicant CARLOS 2AMORA
Owner ERNESTO ESPIN07A 879 N REDONDO DR EAST ANAHEIM, CA 92801
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Compressor/Boiler- up to 15 hp 1
HeatinglCooling Coil 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
��ryIEIM C.q`
City of Anaheim DF io
Building Division ' i
U >
OVNDED vaF
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 7655153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
stonedbeen
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
---
Rough Plumbing (Top Out)
_I
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Conqfrurfinn
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service