Loading...
879 N REDONDO DR W (2)Permit Types BLD I ELE MEC PLM X Permit Number: BLD2011-02204 Issued: 06/13/2011 CITY OF ANAHEIM www.anaheim. neUbui (ding (714)7654626 Quarter Section: 61 Site Address: 879 N REDONDO DR W , ANAHEIM, CA 92801 Legal Description: N TR 1460 LOT 14 APN: 03405307 Project Description: Mechanical to replace air conditioning unit. Living Area. Garage Area: Carport Area: Balcony I Deck Area: Cool Root: Number of Stones: BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Valuation: 0.00 Construction Types: Not Applicable Occupancy Groups: Fire Sprinklered: No Total Fees paid for Permit: 136.73 People Associated with Project: Contractor SERVICE CHAMPIONS PLUMBING HEATING 8A 3150 E BIRCH ST200205291032294650 BREA, CA 92821 Permit Applicant CARLOS 2AMORA Owner ERNESTO ESPIN07A 879 N REDONDO DR EAST ANAHEIM, CA 92801 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Compressor/Boiler- up to 15 hp 1 HeatinglCooling Coil 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ��ryIEIM C.q` City of Anaheim DF io Building Division ' i U > OVNDED vaF Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have stonedbeen 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) --- Rough Plumbing (Top Out) _I Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Conqfrurfinn Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service