879 N REDONDO DR W (8)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2023-01011
Issued: 03/02/2023
www.anahelm.net/building
(714)765-4626
Quarter Section: 61
CITY OF ANAHEIM
Site Address: 879 N REDONDO DR W , ANAHEIM, CA 92801
Legal Description: N TR 1460 BILK LOT 14
APN: 03405307
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Project Description: Reroof: Remove existing to install (29) sq of composition shingles over entire house and attached garage
Living Area: Number or Stories:
Garage Area:
caiponArea:
Balcony / Deck Area:
Cool Roof:
People Associated with Project:
Permit Applicant Sandra Espnioza
Owner ESPINOZA SANDRA R TR 879 N REDONDO DR W
1 Valuation: 18.1D0.00
Construction Types: N/A
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit: 342.35
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�PHEIM �q<
Cityof Anaheim o4 io
Building Division f i
U >
�DUNDED �s�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete un!0 the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765A591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beensinned
Building Final (714 765-5153) y`
Last inspectionFinalOnly After Above Comple etl
I
.W
V
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildincl Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Remit.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Pog.. Ele . Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Mn not hackfiffl unless q,onp.,d off)
Sewer
Water Engineering Backfiow (Testable Only)
Water Service