Loading...
879 N REDONDO DR W (8)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-01011 Issued: 03/02/2023 www.anahelm.net/building (714)765-4626 Quarter Section: 61 CITY OF ANAHEIM Site Address: 879 N REDONDO DR W , ANAHEIM, CA 92801 Legal Description: N TR 1460 BILK LOT 14 APN: 03405307 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Reroof: Remove existing to install (29) sq of composition shingles over entire house and attached garage Living Area: Number or Stories: Garage Area: caiponArea: Balcony / Deck Area: Cool Roof: People Associated with Project: Permit Applicant Sandra Espnioza Owner ESPINOZA SANDRA R TR 879 N REDONDO DR W 1 Valuation: 18.1D0.00 Construction Types: N/A Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: 342.35 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PHEIM �q< Cityof Anaheim o4 io Building Division f i U > �DUNDED �s�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete un!0 the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765A591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensinned Building Final (714 765-5153) y` Last inspectionFinalOnly After Above Comple etl I .W V Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildincl Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Remit.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Pog.. Ele . Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Mn not hackfiffl unless q,onp.,d off) Sewer Water Engineering Backfiow (Testable Only) Water Service