214 S KORGER STPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2012-02901
Issued: 08/28/2012
www.analreim.net/building
(714)765-4626
Quarter Section: 83
CITY OF ANAHEIM
Site Address: 214 S KROEGER ST ANAHEIM, CA 92805
Legal Description: HOTEL DEL CAMPO TR LOT 29 BLK C(AND
APN: 03710408
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765.5153
Project Description: ReroofTo remove and install (24) squares of composition shingles over house and detached garage.
Living Area. Number of Stories:
Garage Area:
Carport Area:
Balcony I Dark Area:
Cool Roof:
People Associated with Project:
Permit Applicant DOMINGO CASAS
Owner DOMINGO CASAS
Valuation:
Construction Types:
Occupancy Groups:
Fire Spnnklered:
Total Fees paid for Permi :
214 S KROEGER STANAHEIM, CA 92805
1,500.00
Not Applicable
No
546.06
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�r,HEIM Cq<
Cityof Anaheim OF iO
Building Division f Z
�0 NDED y8a^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
0o not pour concrete unul the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subtloor or pour floor slab until the follwing applicable items have been
stoned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
L3-2j
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistiGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been started
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Z
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Onlq after Plbg _ Ele Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not bankf flunless stoned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service