Loading...
214 S KORGER STPermit Types BLD ELE MEC PLM X Permit Number: BLD2012-02901 Issued: 08/28/2012 www.analreim.net/building (714)765-4626 Quarter Section: 83 CITY OF ANAHEIM Site Address: 214 S KROEGER ST ANAHEIM, CA 92805 Legal Description: HOTEL DEL CAMPO TR LOT 29 BLK C(AND APN: 03710408 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765.5153 Project Description: ReroofTo remove and install (24) squares of composition shingles over house and detached garage. Living Area. Number of Stories: Garage Area: Carport Area: Balcony I Dark Area: Cool Roof: People Associated with Project: Permit Applicant DOMINGO CASAS Owner DOMINGO CASAS Valuation: Construction Types: Occupancy Groups: Fire Spnnklered: Total Fees paid for Permi : 214 S KROEGER STANAHEIM, CA 92805 1,500.00 Not Applicable No 546.06 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�r,HEIM Cq< Cityof Anaheim OF iO Building Division f Z �0 NDED y8a^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 0o not pour concrete unul the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subtloor or pour floor slab until the follwing applicable items have been stoned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed L3-2j Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistiGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been started 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Z Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Onlq after Plbg _ Ele Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not bankf flunless stoned off) Sewer Water Engineering Backflow (Testable Only) Water Service