Loading...
550 S LEXINGTON PL (2)Permit Types BUD ELE MEC FILM X Permit Number: BL02025.00475 Issued: 01/30/2025 wvvw.anahern.net/building (714)765-4626 Quarter Section: 103 Site Address: 550 S LEXINGTON PLANAHEIM, CA92805 Legal Description: N TR 1697 BLK LOT 88 APN: 08236509 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Reroof: To remove and install (20) squares of composition shingles over house AND (5) sq of composition on the detached garage Living Area. Number of Stones: 1 Valuation: Garage Area: Consuuc5on Types: CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof. Total Fees paid for Permit: People Associated with Project: Contractor HOME RENEW 360 1500 W CARSON STREET #201201803161205031313 LONG BEACH, CA 90807 Permit Applicant Adi Benmoyal Owner SOLORIO, MIGUEL 550 S LEXINGTON PL 7,000.00 VB 359.91 Type Electrical Fixtures Cry Type Plumbing Fixtures Cry Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. 'Nr,NEIM �q< Cityof Anaheim 04 a Building Division F i > �OONDED te`'^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensioned Building Final (714 766-5153) Last Inspection -Final Only After Above Completed (�s //�/" 4' � Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistIGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof ( heathi /Diaphragm/Frame) a J$G Masonry(Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service