Loading...
121 S CERRO VISTA WAY2 - Permit Types CITY OF ANAHEIM ((Jl BLD ELE MEC PLM X e BUILDING DIVISION Permit Number: BLD2025-00159 200 S. ANAHEIM BLVD. Issued: 01/13/2025 (714)765.5153 www.anaheim.net/building (714)765-4626 Quarter Section: 162 Site Address: 121 S CERRO VISTA WAY ANAHEIM, CA92807 AL Legal Description: P BK 80 PG 28 PAR 1 - APN:36124129 Project Description: Reroof: To relay (39) squares of heavyweight tile and (1) square of flat roof PVC over house and attached garages Uving Area: Number of Stones: 1 Valuation: 35,000.00 Garage Area: Construc8on Types: VB Carport Area: Occupancy Groups. Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 1,109.55 People Associated with Project: Contractor HOYT ROOFS INC 1809 N ORANGETHORPE PARKABCDE11140254 ANAHEIM, CA 92801 Permit Applicant Fernando Toledo Owner GRANT, TRINH TR PO BOX 18808 Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPHEIM cq` Cityof Anaheim D� io Building Division F Z U > DVNDEO 1SN1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete umii the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been stonedBuilding Final (714 765-5153) Last Inspection -Final Only Aker Above Completed 2 L Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reir f.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Plbg_ Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service The following table provides a summary of the preceedinganalysls and Indicates which members(Ifany) require further field verification or strengthening. When strengthening is required, refer to the Roof Plan (and associated details when applicable) in this report for specific Information about the strengthening measures required for this project. Any required strengthring shall be completed prior to the installation of any new roof leads, Refer to the Terms and Conditions section of this report for additional information about the means and methods of construction. ANALYSIS SUMMARY _ Member I IS Field verification by Contractor Required? IS Strengthening Required? Jt No No J2 No No J3 No No B1 No No Tt No No Pt No No P2 No No SEAL AND SIGNATURE The preceding structural analysis has been performed by Regal Structural Group expressly for the project located at 121 s Cerro Vista Way in Anaheim, California. The analysis and recommendations are based on the as -built conditions at the time of the structural survey noted in this report. Any alterations or modifications to the existing roof structure after the survey date have not been taken Into account. If any modifications have occurred, further investigation and analysis would be required prior to Implementing any reroofing or strengthening. f A?eoc November 12, 2024 Nick Murphy..E.I manafling Principal DATE No 71600 Up. Imins Clvl� Regal Structural Group 3857 Birch Street #282 R E G A L Newport Beach, CA 90803 wwwregalstructuralzrouti S T R U C T U R A L G R O UP p; g494414498 e: roofs@regalstructuralgroup.com ®Copyright 2024 Regal Structural Group and that Me ronlontal span Tl 2t4 OF-L N; ! HUSS 24'0C between panel points of the top (Conhrm M,:.e ' I.a,d Span s e'-Cq rho,d d0es mN axrned 8' 0" Eaarnple: Fmk Roof Framing Plan Not to ScaFe (E) ASSUMED ROOF WEIGHT: Concrete Tile (9.7) = 9.7 psf TILE RELAY: Concrete Tile (9.7) = 9.7 psf T1 P1 2z8 No No .. See Plan for Strengthening Requirements Plan Notes: 1. THE ROOF SLOPE IS 10:12(UNC). 2. ALL FRAMING INDICATED ON THIS PLAN IS EXISTING UNLESS NOTED OTHERWISE 3. THE CONTRACTOR SHALL VERIFY THAT THE EXISTING FRAMING SIZE AND SPACING MATCHES THAT SHOWN ON THE ROOF PLAN. SHOULD THERE BE A DISCREPANCY, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SO THAT AN UPDATED REPORT CAN BE PROVIDED. 4. THE SPAN INDICATED IN PARENTHESIS IS THE MAXIMUM SPAN FOR THE FRAMING IN THE GWEN PAY. SHOULD THE ACTUAL HORIZONTAL SPAN INOT SLOPING SPAN) EXCEED THAT SHOWN, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SO THAT AN UPDATED REPORT CAN BE PROVIDED. S. WHERE THE EXISTING FRAMING COULD NOT BE VERIFIED IN THE FIELD DUE TO LIMITED ACCESS OR WAS COVERED WITH FINISHES, IT IS NOTED WITH AN ASTERISK I-). IN THESE INSTANCES THE CONTRACTOR SHALL VERIFY THE FRAMING AFTER THE EXISTING ROOF HAS BEEN REMOVED AND NOTIFY THE ENGINEER IF THE EXISTING FRAMING DOES NOT MEET OR EXCEED THAT WHICH IS IN DICATEO IN THE REPORT. B. FRAMING SHOWN HAS NOT BEEN ANALYZED TO SUPPORT STORAGE LOADS. WHERE STORED ITEMS EXIST ABOVE THE EXISTING CEILING JOISTS, IT SHOULD EITHER BE REMOVED OR ELSE SPREAD OUT 50 AS NOT TO EXCEED MORE THAN 5 POUNDS PER SQUARE FOOT. ®Copyright 2024 Regal Structural Group CITY OF ANAHEIM BUILDING DEPARTMENT 2016 CALIFORNIA CODES 200 S. Anaheim Blvd., Suite 145 CODECYC Anaheim, CA 92805 Ol/01/2017 714 765-5153 EFFECTIVE DATE w .anaheim.net/building SMOKE DETECTORS AND CARBON MONOXIDE SELF CERTIFICATION ` Final inspection approval will require this completed form to be on site along with the job card. Permit Number: F3LO )-02S--00 l S 9 Date: I !I u lZ<3- Project address: Property Owner: "/ httn.l2 (4Va",t The undersigned does hereby certify that I am the property owner of the above referenced property. I further certify that smoke alarms and carbon monoxide alarms are present and functional in all the following locations. All boxes must be checked below 121'�Smoke Alarms and Carbon Monoxide Alarm: On the ceiling or wall outside of each separate sleeping area in the immediate vicinity of bedroom/s or in each hallway outside of the rooms. R" Smoke Alarms: In each room used for sleeping purposes. All Smoke Alarm and Carbon Monoxide Alarm: In each story, including any habitable basement; (Note: in dwellings or dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm and a carbon monoxide detector installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level.) requir onoxide detectors. Date- /— % -1 Cam" California Residential Code (CRC) Section R314.6.2,CRC R315.2 states in part that existing dwellings be .retrofitted with smoke detectors and carbon monoxide detectors when a building permit is issued for work on or in a building that is valued at $1,000 or more." CRC Section R314.3, CRC R315.2 defines required locations as indicted above. NOTE: This certification is only used when normal access to the interior of the dwelling by the City of Anaheim Inspector is not achieved during the course of project construction. It is normally used for exterior projects such as re -roofing, re -siding, patio covers, solar photovoltaic installations, and similar exterior construction work. 200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax FEB 2018 w .anaheim.net/building B842 SMOKE/ CO ALARM REQUIRED LOCATIONS Figure 1 Bedroom Family Room rlY Dining Living Room Kitchen Bedroom Bedroom Figure 2 _I 4• Figure 3 REQUIRED SMOKE ALARM LOCATION REOUIRED CARBON MONOXIDE ALARM LOCATION