418 S FALCON ST (2)Permit Types
BLD
ELE
MEC
FILM
X
X
X
X
Permit Number: OLD2022-04581
Issued: 02/20/2024
www.anaheim.net/building
(714)7654626
Quarter Section: 47
Site Address: 418 S FALCON ST BAnaheim, CA 92804
Legal Description: N TR 2402 ELK LOT 63
APN: 12809124
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: (ADU) New Residential Construction: 988 sq ft new detached accessory dwelling unit with 36 sq ft covered porch.
Install solar with (8) modules, (8) micro -inverters and a 125 amp load center. 437 sq ft new two -car garage attached to ADU to service
main house. (2BD/2BA) REF BL02024-00755
Living Area:
99s
Number of Stones:
1 Valuation:
160,000.00
Garage Area:
437
Conslruc6on Types:
V8
Carport Area:
Occupancy Groups'.
R3, 52
Balcony I Deck Area:
Fire Sprinklered:
No
Cool Roof:
Total Fees paid for Permit:
9,537.34
People Associated with Project:
Contractor SOLARTIME ELECTRICAL SERVICES 14371 EUCLID ST it2F202005061839323270 GARDEN GROVE, CA 92843
Permit Applicant GIANG S VO
12352 CORVETTE ST GARDEN GROVE, CA 92841
Owner VU MINH TRANG
1433 S HACIENDA ST
Contractor MODERN MUSE CONSTRUCTION INC 12606 HOOVER STREET
GARDEN GROVE, CA 92841
Type. Electrical Fixtures
City
Type Plumbing Fixtures
Qty Mechanical Fixtures
Qty
EV Charger
1
Bath Tub
2 Condenser
1
Meter/Disc Sw - Under 600 V, up to 200
2
Garbage Disposal
1 Heating Appliances, including vent
1
amps
Gas System (outlets)
Heating/Cooling Coil
1
1
Microinverter
8
Residential Registers (ducts)
3
New or total rewire -1 or 2 family
988
Gas Yard Piping
1 Ventilation Fan - <= 300 cfm on single duct
4
New or total rewire - garage/carport
437
Kitchen Sink
1
Sub Panel/Temp Pwr - Under 600 V, up to
1
Lavatory
2
200 amps
Repair/Drainage Alteration/Vent Piping
i
Sewer per 100 ft.
1
Washing Machine Rough
1
Water Closet
2
Water Distribution
1
Water Heater
1
Water Main per 100 ft.
1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNr,,AEIM �q<
Cityof Anaheim g4 io
Building Division i
u >
�OVNDED �a�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
11-11-2Y
dCf
Electrical Final
5-17-z-e
d &
Plumbing Final
SITzN
6lr
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
7-f 1-Z f
-�--
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
L25 -
,TSB
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
S/S /z Y
L• Ai^1 H
Sub List/Bus. Lic. (714) 765-5194 (Allow, 10 business days)
Setback/Forms/Trenches (Footings)
J/Syzy I
L. ICA.J /
COA/Migation Measures
Do not install subfloor or pour floor slab until the follmng applicable items have been
sianed
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
/0-16 -2-
D. tc' s�Y
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
3-28'-rY
,J7�
Pre -slab (Compaction/Membrane Reinf.)
3.s=2y
�, /�IF,J
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been stoned
1st Floor Shear
-2z z
Q Cs-
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
3-i,.Zy
A, KA"I-/
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
)-zz�2
6.6-
Rough Duct (Mechanical)
!-z z�d
J. Lr
Rough Mechanical
;-2ez-(
66—
Rough Electrical
-zZZY
aCy
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
;{-zz-2{
d /r
Insulation(Sound/Energy)
6ZY-2Y
rS�
Do not tape or plaster unfit the following applicable items have been signed
Drywall
/-itozy
a f(r
Drywall Penetrations (Ele, Mec & Plbg)
(-Y-zy
,46-
Interior Lath
ExteriorLath
y-
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
�,-y.zd
d e,
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ell or Mec.)
Grease Interceptor
(Do not hackfrll unless sinned off I
Sewer
Water Engineering Backflow (Testable Only)
Water Service
-27-2y
,QG—