Loading...
385 S HENNING WAY (11)Permit Types BUD ELE MEC PLM X X Permit Number: BLD2024-02155 Issued: 08/08/2024 vivinw.anahelm.net/building (714)765-4626 Quarter Section: 198 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 385 S HENNING WAY Anaheim, CA 92807 Legal Description: P BK 254 PG 28 PAR 2 P.M. 254-28 PAR. 2 POR. AND P APN: 35640110 - -- Project Description: Photovoltaic System: Install residential roof mounted solar system with (68) modules, (2) inverters and 200amp main panel. Living Area: Numbest Stories: 0 Valuation: 55,000.00 Garage Area: Construction Types: VB CarportArea: Occupancy Groups: Balcony / Deck Area. Fire Spnnklered: Cool Roof: Total Fees paid for Permit. 2,229.15 People Associated with Project: Contractor FREEDOM FOREVER LLC 43445 BUSINESS PARK DR 2 TEMECULA, CA 92590 Permit Applicant jonathon torres Owner MALAKOOTI, HAMID TR 2001 385 S HENNING WAY Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Oty Inverter 2 Meter/Disc Sw - Under 600 V, up to 200 1 amps Sub Panel/Temp Pwr - Under 600 V. up to 1 200 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. aPHEIM Cq Cityof Anaheim O� P (�� Building Division 2`` - � •;' • O`a/DED ah� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Zj1J2 Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 766.6126 Fire Sprinkler (ONLY) (714) 765-5041 INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) SetbackiformslTrenches (Footings) COAIMtgation Measures Do not install subfloor or pour floor slab until the follvMg applicable items have been Building Final (714 765-5153)sioned Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have lot Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Ptbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New ngrifttrurtion Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service