Loading...
526 N HAMPTON ST (7)Permit Types BLD ELE MECI PLM X I I X Permit Number: BLD2025-00101 Issued: 01/08/2025 www.anaheim.neyt/building (714)765-4626 Quarter Section: 26 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 .5153 Site Address: 526 N HAMPTON ST ANAHEIM, CA 92801 Legal Description: N TR 2451 BLK LOT 19 APN: 07141106 - - - Project Description: Residential Remodel: Plumbing To install new walk-in tub in master bathroom. Electrical for fixture upgrades Living Anew Number of Stories. 1 Valuation: 9,500.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Gmups: Balcony I Deck Area: Fire Sprimdered: Cool Rcof: Total Fees paid for Parme: 230.24 People Associated with Project: Contractor SAFE STEP WALK IN TUB LLC 520 ROYAL PARKWAY SUITE 100 NASHVILLE, TN 23602 Permit Applicant Demond Murphy Owner SPALLINO, BRUCE J & CAROL 526 N HAMPTON Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures Qty Receptacle, switches, lights 1 Bath Tub 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim PNp,tt Elea C. < O4 iO Building Division F Z > DO DEC) teen Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are rel�3sed Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus, Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sionei 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/DiaphragmlFrame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Pfbg_ Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service